My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GWScope4_20060915
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GWScope4_20060915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:53:06 AM
Creation date
7/17/2008 10:26:55 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 4 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
9/15/2006
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Task 49.2 Site Evaluation <br />• Evaluation criteria will be developed to assess potential recharge locations. The criteria will <br />have quantitative performance measures assigned, to the extent possible, so that each site can <br />be evaluated and ranked in an objective and systematic manner. The criteria will be <br />developed with input from local experts and interested parties. A preliminary list of <br />evaluation criteria includes: <br />o Physical considerations, including <br />^ hydrogeology <br />^ available storage capacity <br />^ infiltration rates <br />^ groundwater travel time to surface streams <br />o Environmental considerations, including <br />^ water quality <br />^ critical habitat <br />^ wetlands <br />o .Economic considerations, including: <br />^ land ownership and site access <br />^ existing infrastructure <br />^ proximity to areas of water supply and demand <br />^ implementation costs <br />It should be noted that the availability of specific sources of water will not be investigated as <br />part of this study, but if this type of information becomes available during the course of this <br />study it will be presented. <br />• It is anticipated that potential recharge locations will be evaluated and screened in a two-stage <br />process. For the first stage, selected criteria, such as physical suitability and availability of <br />existing infrastructure, will be used to eliminate potential sites that do not meet these <br />minimum criteria. The remaining locations will then be evaluated using the full set of criteria. <br />Each potential recharge location will be scored and ranked according to the performance <br />measures that are developed for each criterion according to its overall suitability for <br />underground storage. <br />• The results of the site evaluation and screening will be included in the report as described in <br />Task 49.3. In addition, this information will be reviewed with the CWCB project manager, <br />and experts he deems appropriate, as it is developed. <br />SPDSS_Phase4_gvv_SOW_09-I 5-06.doc 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.