Laserfiche WebLink
~: <br />Task 36.3 Well Construction and Testing <br />The drilling and completion procedures will be reviewed and adjusted if necessary to finish the <br />drilling and completion of the bedrock well in Phase 3. <br />Deliverables: <br />Task 36.3 Bedrock Well Construction Technical Memorandum <br />• Ali deliverables outlined in Phase 2 task 36.2 will required under this task. <br />Task 39: Collect Water Level Data <br />Objective: <br />This task will enhance the State's groundwater level database by continuing the Phase 2 <br />collection of measurements during the fa112005 season after agricultural pumping has ceased and <br />will add to the understanding of seasonal changes in groundwater levels when compared to the <br />SEO's spring season measurements. This Task will help fulfill one of the recommendations of <br />the SB 96-74 Review Committee. <br />Approach.• <br />Task 39.1 Water Level Measurements <br />• Up to 120 bedrock wells used during Phase 2 Task 39 are expected to be measured during the <br />autumn post-irrigation season water level measurement. <br />• It is anticipated that the Consultant will not need to contact any of the well owners, that access <br />to the wells will be straightforward, and that separate site visits will not be needed prior to <br />collecting the water level field data. <br />• The Consultant will collect measurements of the depth to water at each site using. methods <br />comparable to those currently used by the State during their spring-season measurements. <br />The measurement date, time, site identification number, measuring point location, casing <br />stickup and other descriptive information pertinent to the measurements will be noted and <br />recorded in a field notebook. <br />• Monitoring wells installed during Phases i and 2 that were equipped with water level data <br />loggers will be visited twice, at approximately 6- to 9-month intervals, and the data will be <br />downloaded. Analysis of this data will occur under Task 44. <br />• The measurements tabulated in a field notebook will be entered into an existing electronic <br />database of water level measurements by consultant. Following data QC, the electronic data <br />SPDSS Groundwater SOW, Phase 3 g <br />