My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GISScope4_20060711
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GISScope4_20060711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2010 9:52:57 AM
Creation date
7/17/2008 10:03:15 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 4 - Spatial System Integration Component
Description
Scope of Work for the Spatial System Integration component of the South Platte Decision Support System (SPDSS) for Phase 4.
Decision Support - Doc Type
Scope of Work
Date
7/11/2006
DSS Category
GIS
DSS
South Platte
Basin
South Platte
Contract/PO #
C153960
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />Task 99. GIS Support and Data Maintenance <br />Objective.• Provide ongoing GIS technical support and data maintenance for the SPDSS project during <br />Phase 4. Modify, enhance, and maintain GIS tools developed under SPDSS for efficient data extraction, <br />mapping, data dissemination, and access. Provide focused technical support for western slope irrigated <br />lands mapping. <br />Background: Under previous phases a number of GIS data, analysis, and mapping tools were developed. <br />These require ongoing support and development enhancements in response to user requests. Irrigated <br />lands mapping for the western slope is beginning to be partly conducted `in-house' by the state, and <br />analysts will require technical support as they begin this process. <br />Approach: <br />99.3 GIS support and maintenance. Handling queries from the State, and refining/adjusting SPDSS <br />GIS data once SPDSS is final. Includes incorporating essential GIS and other spatial data products that <br />become available from outside agencies (e.g., USGS) during SPDSS activities. Also included is response <br />to specific but limited requests for GIS data and applications from the State and others involved in <br />developing the SPDSS (e.g., surface creation for groundwater investigations; satellite imagery for <br />updating channel alignments for surface water investigations). This general maintenance does not include <br />any correction of errors or omissions to products that may be identified in the deliverables provided by <br />the Contractor in other tasks throughout this scope of work. <br />99.4 Modify and maintain GIS tools. Modify ArcCDSS to accommodate State requirements during <br />Phase 4, and update the associated documentation. Modify and maintain CDSS Map Viewer to <br />accommodate State requirements during Phase 4, and update documentation. Included will be an update <br />of the Map Viewer tool to display map tips a feature requested by staff with CWCB and DWR. Map tips <br />will display the value of a selected or predefined attribute for a selected layer in the text frame, when <br />pointing at a feature with a mouse. This will reduce clutter on the map display and will be very useful for <br />users. <br />Deliverables: <br />99.3 Updated GIS databases and specific GIS applications for the State and other contractors. Ongoing <br />support to technical activities of the State including maintenance and use of databases, irrigated lands <br />mapping, spatial data, and results. <br />99.4 Upgraded ArcCDSS tools and related documentation. Upgraded CDSS Map Viewer including map <br />tips and other features, and related documentation. <br />Task 103. Coordination and Project Management <br />Objective: Promote communications and technical exchange among the Consultant, State, water users and <br />other SPDSS consultants; track work accomplished, maintain budget and schedule; and, regularly report <br />the status of work activities. <br />Approach: <br />Task 103.1 Advisory meetings. Prepare for and participate in one annual advisory meeting for Phase 3. <br />Prepare for and participate in one technical advisory committee meeting specific to GIS and irrigated <br />lands assessment during Phase 3. <br />Task 103.2 SPDSS coordination. Schedule regular and as-needed meetings and/or conference calls to <br />communicate with State and other consultants about data needs, results, issues, progress, etc., during <br />SPDSS development. Anticipated are 2 hours of coordination activities per week during Phase 4. <br />Task 103.3 Project management. Prepare and present to the State 12 monthly progress reports during <br />Phase I and 2 that include the following three components: <br />
The URL can be used to link to this page
Your browser does not support the video tag.