My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RGDSS_SurfaceWater_ScopeOfWork
CWCB
>
Decision Support Systems
>
DayForward
>
RGDSS_SurfaceWater_ScopeOfWork
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:33:25 AM
Creation date
7/10/2008 1:43:06 PM
Metadata
Fields
Template:
Decision Support Systems
Title
RGDSS Surface Water Scope of Work
Description
The objectives of this scope of work are as follows: 1) To apply and enhance an existing data centered surface water modeling system to the San Luis Valley that interacts with the State's central database (HydroBase) and other RGDSS planning tools. 2) To calibrate and test, via application, a San Luis Valley Surface Water Model that, is 100% data centered. 3) To coordinate and share the surface water investigations with SLV water users, the State, a technical subcommittee and other RGDSS contractors.
Decision Support - Doc Type
Scope of Work
Date
11/8/1998
DSS Category
Surface Water
DSS
Rio Grande
Basin
Rio Grande
Contract/PO #
C153863
Grant Type
Non-Reimbursable
Bill Number
HB98-1189, SB99-173
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 4 Conduct Basin Meetings <br />Objective <br />Develop and document our understanding of basin operations in sufficient detail to facilitate <br />surface water modeling and to support selected data needs for modeling being done by other <br />contractors. This understanding will be developed through interviews of DWR personnel, <br />operators of the large ditch systems, and representatives of federal facilities. <br />Comment <br />Meetings with local water interests will be coordinated with other RGDSS consultants so as <br />to minimize the number of contacts/meetings required and to ensure consistency of the <br />information provided to and obtained from those entities. These meetings (with the <br />exception of CWCB) are expected to occur in the San Luis Valley. <br />Approach <br />4.1 Prepare Interview Outlines and Schedules <br />Based on existing information and knowledge gained in Task 1 through Task 3, outline <br />interview topic areas and questions. Select interviewees and establish interview schedules. <br />Contact other RGDSS consultants by phone to learn their projected information needs from <br />the selected interviewees and incorporate those needs into interview outlines where possible. <br />The deliverable for this Sub-Task will be interview outlines (topic areas of discussion for <br />each interview), a schedule to complete the interviews and a mailing of the interview outline <br />to each interviewee.. <br />4.2 Division Engineer Interview / Prepare Summary Memorandum <br />Meet with the Division 3 Engineer and assistant regarding Compact and day-to-day <br />administration of surface and ground water issues. Obtain or develop line diagrams showing <br />locations of key structures (identified in Task 1.3). Document discussions in a memorandum <br />(approximately 10 pages) containing enough detail to provide the basis for modeling basin <br />water rights and Compact administration. The deliverables for this Sub-Task include line <br />diagrams showing locations of key structures, and the summary memorandum describing <br />Compact and day-to-day administration. <br />4.3 CWCB Interview /Prepare Summary Memorandum <br />Meet with the Colorado Water Conservation Board regarding instream flow rights and other <br />instream water use issues in the Rio Grande Basin. Document discussions in a memorandum <br />(approximately 5 pages) containing enough detail to provide the basis for modeling instream <br />flow aspects of water rights administration in the Rio Grande Basin. The deliverable for this <br />Sub-Task is the summary memorandum. <br />RGDSS Surface Water Scope of Work 10 11/8/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.