My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_KeyStructure_VidlerTunnel
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_KeyStructure_VidlerTunnel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:52:20 AM
Creation date
7/10/2008 9:18:18 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, Vidler Tunnel
Description
The Vidler Tunnel has been identified as a key structure for the South Platte Decision Support System (SPDSS) consumptive use and surface water modeling efforts. The purpose of this Task 5 memorandum is to document physical, legal, and operational aspects of those key structures identified.
Decision Support - Doc Type
Task Memorandum
Date
5/7/2004
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Municipal <br />Commercial <br />Industrial <br />Recreation <br />Homestead Tenmile <br />12/31/1895 10/26/1937 5.48 cfs Fishery <br />Ditch Creek <br />Fire <br />Domestic <br />Wildlife <br />b/ <br />Storage <br />Municipal <br />Commercial <br />Industrial <br />Recreation <br />Blue Danube Barton <br />5/30/1891 3/1/1910 7.0 cfs 111.8 af Fishery <br />Ditch Creek <br />Fire <br />Domestic <br />Wildlife <br />b/ <br />Storage <br />Junior Water Right <br />Irrigation <br />Municipal <br />Vidler Tunnel Peru 25.2 Absolute No <br />7/28/1959 5/31/1972 Industrial <br />Unit Creek 14.6 Conditional Limitation <br />Domestic <br />Stock <br />a/ Colorado Water Rights Tabulation. <br />b/ “Senior” and “Junior” designation refe rs to seniority relative to direct flow and storage rights of Dillon and Green <br />Mountain reservoirs. <br />c/ These water rights decreed for exch ange and storage in Guanella Reservoir pursuant to the City of Golden’s <br />augmentation plan, Case No. 83CW361. <br />Associated Storage: <br />Vidler Tunnel diverts dire ct flow water from the Western Slope to the <br />Eastern Slope. There is no associated stor age on the Western Slope. Storage of water <br />transported through Vidler Tunnel on the Easter n Slope is addressed in two cases filed by <br />the City of Golden, Case N o. 83CW361 and Case No. 02CW379. <br />Golden’s Augmentation Plan, Case No. 83CW3 61, includes an exchange for storage in <br />Guanella Reservoir of two groups of water ri ghts decreed for transbasin diversion: the <br />Blue Danube Ditch water rights and the Homestead and Giberson Ditch water rights. <br />Golden’s proposed Augmentation Plan, Case No. 02CW379, includes the addition of the <br />remaining Vidler Tunnel water rights as approved sources of augmentation to fill <br />Guanella Reservoir. <br />Compact and Other Legal Considerations: <br />If Golden’s proposed augmentation plan (Case <br />No. 02CW379) is approved, the exchange of Vi dler Tunnel water will be junior to the <br />Colorado Water Conservation Board (CWCB) in stream flow right on West Fork Clear <br />Creek approved in Case No. 87C W276. In order to prevent in jury to the instream flow <br />water right, Golden plans to limit the proposed exchange of Vidler Tunnel water to those <br />times when the CWCB instream flow water right is satisfied. <br />VidlerTunnel.doc 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.