My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task5_CBoulder_20050309
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task5_CBoulder_20050309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:22:53 PM
Creation date
7/9/2008 9:45:36 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 5 - Key Structure, City of Boulder
Decision Support - Doc Type
Task Memorandum
Date
3/9/2005
DSS
South Platte
Basin
South Platte
Contract/PO #
C153954
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Leonard Rice Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HydroBase Data <br />The monthly diversion data available in HydroBase over the 1950-2002 period of record <br />pertaining to the City of Boulder's operations of the Boulder Reservoir and Main Boulder Creek <br />System include the following: <br />Period of Record <br />Boulder Reservoir Municipal Intake (WDID 0600800) 1985 - 2003 <br />Reservoir storage has historically been recorded for the following: <br />Period of Record <br />Boulder Reservoir (WDID 0604515) 1955 - 2003 <br />Diversions under the City's Farmers Ditch and Baseline Reservoir changed irrigation rights are <br />recorded under the Farmers Ditch diversion points. The City's other changed water rights are <br />recorded under the City's points of diversion from North Boulder Creek and Middle Boulder <br />Creek, except for the City's North Boulder Farmers and Lower Boulder Ditch rights which maybe <br />recorded under the ditch diversion point when used for irrigation under the ditch. <br /> Figure 6 <br /> Boulder Reservoir <br /> End of Month Storage <br /> <br /> 14000 <br />w <br /> 12000 <br /> <br /> 10000 <br />~ ~ <br /> 8000 i, <br /> <br />~ 6000 <br /> 4000 <br />~ <br /> 2000 <br />c <br />~ <br />c 0 <br /> O ~ 00 N (O O ~ 00 N (O O ~ 00 N <br />~ ~ ~ (O (O I~ ~ ~ 00 00 O O O O <br /> C C C C C C C C C C <br />(B (B (B (B (B (B (B (B (B (B C C C C <br />(B (B (B (B <br /> <br /> Month/Year <br />The City's wastewater is treated at the 75th Street Wastewater Treatment Plant, located near the <br />intersection of Boulder Creek and 75th Street. The Wastewater Treatment Plant has a capacity of <br />20 MGD and discharges to Boulder Creek just downstream of the Boulder Supply Canal. <br />City of Boulder Memo.Doc Page 15 of 30 March 9, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.