My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Upper Yampa Implementation Plan
CWCB
>
Watershed Protection
>
DayForward
>
Upper Yampa Implementation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 10:00:21 PM
Creation date
6/20/2008 11:43:39 AM
Metadata
Fields
Template:
Watershed Protection
Document ID
hr_0008
Contract/PO #
PO 05-61
County
Routt
Community
Steamboat Springs
Stream Name
Yampa River
Basin
Yampa/White
Sub-Basin
Upper Yampa 14050001
Water Division
6
Title
Upper Yampa River Basin Implementation Plan
Date
1/3/2006
Prepared For
CWCB
Prepared By
Routt County Conservation District
Watershed Pro - Doc Type
Planning Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mur~h 2006 KCCD Upper Yumpu River Baa'in Implementation Plan • 24 <br />• Prepare PowerPoint educational presentation and tour informational packet/agenda. <br />• • Conduct tours. <br />• Prepare follow-up newspaper articles. <br />Required Resources: Tour sites/guides; luncheon/barbeque site; food/drinks; door prizes/ <br />drawings; computer access/paper; bus/transportation; <br />Project Budget Estimates: $2,500/year <br />Potential Funding Sources: RCCD; CACD; Routt County <br />Implementation Schedule: Annually, during the summer/fall field season. <br />5.4 RE-\/ISIT 208 PLAN AND Ih9PLEMENTATION PLAN <br />Participants in the 208 Plan and this Impl^mentation Plan agree that provisions must be made to re-visit <br />;ind update both the 208 Plan and this Implementation Plan on a regular basis. In that regard, Routt <br />County Department of Environmental Health, with the assistance of the WQCD, RCCD, NRCS, and <br />the City of Steamboat Springs, will schedule an annual meeting to discuss watershed projects and <br />future direction. The First meeting is anticipated to be scheduled for fall (October/November) ?006. <br />• <br />• <br />KCCD * 1-171 Prar Grnre Koud, ;Gri/e 201.~I +S7rurirGn,rl.Sprirt~r. CO 30-FS'7 + (970J 379-322i <br />
The URL can be used to link to this page
Your browser does not support the video tag.