My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Paonia River Park Project
CWCB
>
Watershed Protection
>
DayForward
>
Paonia River Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 9:59:55 PM
Creation date
6/10/2008 8:47:08 AM
Metadata
Fields
Template:
Watershed Protection
Document ID
hr_0013
Contract/PO #
PO 05-59
County
Delta
Community
Paonia
Stream Name
North Fork Gunnison River
Basin
Gunnison
Sub-Basin
North Fork Gunnison 14020004
Water Division
4
Title
Paonia River Park Project Report
Date
4/25/2006
Prepared For
CWCB
Prepared By
North Fork River Improvement Association
Watershed Pro - Doc Type
Project Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cost to date: $1360 (in-kind from volunteers- 80 hours at $17 per hour) <br />First Day Completed: September 30, 2006 <br />TASK 6: ~I-Hooks, C'ros~s L'anes~, as~d Bozrlder C,I7zsters <br />Products: So far, one rock vane has been placed upstream of the new boat ramp. <br />Rocks were acquired from on site. <br />Cost to date: $100 <br />Completed: April 12, 2006 <br />Task 7: Educational ar~d Recreatio~~al facilities <br />A. Fet~cirag <br />Products: 400 feet of 6 foot chain link fence and <br />1740 feet of 3 strand barbless wire fence that <br />divides Delta Sand & Gravel's industrial area <br />from the park. <br />Cost to date: $12,900 <br />Completed: February 15, 2006 <br />B. Ren~ovalco>>ering of C,oy~crete <br />Products: A 500 square foot area that was formerly a dumping site for junk concrete <br />and asphalt is now graded and covered with gravel (the boat turnaround) and top soil <br />that has been seeded. Much of the concrete was cn~shed and used in the boat ramp <br />construction. <br />Cost to date: $1088 <br />Completed: April 10, 2006 <br />C'. Trail af~d boat r°anip cor~str~rctio~ <br />Products: A 100 foot footpath from the boat ramp along the floodplain for fishermen, <br />school groups, and park users. <br />Cost to date: $3,750 <br />Completed: April 10, 2006 <br />TASK 8: Project C,oordinatiorl, Administration, & ~ % co~~tingencv <br />Products: NFRIA staff, planned, coordinated and adnunistered the project. Matching <br />funds were solicited and secured, invoices collected, and reports were produced. Staff <br />are still working with the Army Corps of Engineers and neighboring landowners on <br />design and implementation of restoration of the Park property. <br />Cost to date: $2000 <br />Not yet complete <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.