My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:15:41 AM
Creation date
6/9/2008 12:58:31 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 Phase 2 Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring
Description
This document presents the Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring. This document includes the memo and figures. Appendices are included in a separate document.
Decision Support - Doc Type
Task Memorandum
Date
8/13/2004
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Platte Decision Support System Groundwater Component Task 33 Field Study Work Plan <br />for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring <br />Table 2 Denver Basin Region Areas of Interest for Phase 2 Alluvial Well Installation and Testing <br /> Number of <br /> Potential Existing <br /> Number of Aquifer <br /> Number of Existing Tests in <br /> Proposed Supplemental Interest <br />Area New Wells Wells Total Area Rationale and Objectives <br />Henderson 3 6 9 5 Evaluate surface water - <br /> groundwater interaction and <br /> groundwater flux in the <br /> mainstem alluvium at this <br /> stream gage location <br /> Fi ure 4 <br />Beebe Draw 3 3 6 1 Estimation of the groundwater <br /> flux discharging from Beebe <br /> Draw to alluvium of main stem <br /> of South Platte (Figure 5) <br />Kersey 7 3 10 5 Estimation of the groundwater <br /> flux and surface water - <br /> groundwater interaction in the <br /> main stem alluvium at this <br /> stream gauge location, <br /> evaluate groundwater flux in <br /> main stem alluvium (Figure 6) <br />Box Elder 2 4 6 1 Estimation of the groundwater <br />Creek flux discharging from Box <br /> Elder Creek to alluvium of <br /> main stem of South Platte <br /> Fi ure 7 <br />Weldona 3 6 9 3 Evaluation of surface water- <br /> groundwater interaction and <br /> groundwater flux at river gage <br /> location Fi ure 8 <br />Big Sandy 2 2 4 2 Estimation of the groundwater <br />Creek flux discharging from Denver <br /> Basin Region via Big Sandy <br /> Creek alluvium, toward the <br /> Arkansas River (Figure 9) <br />Total 20 24 44 17 <br />2.2 Task 35, Proposed Lower South Platte Alluvium Region <br />Alluvial Aquifer Monitoring Well Locations <br />Figure 9 shows the three areas of interest in the Lower South Platte Alluvium Region <br />that have been targeted for additional investigation in Phase 2. These interest areas <br />include Beaver Creek, Balzac, and Julesburg. Figures 11 through 13 show locations <br />where aquifer property and water level data are available, along with the proposed <br />new well locations. These locations are selected to allow quantification of <br />groundwater flow in the alluvium at gaging locations and to define inflows at select <br />tributary valleys. A total of seven new wells are proposed for Phase 2, as shown in <br />Table 3. Table 3 also shows the number of existing wells and aquifer tests that will be <br />used at each site to meet the data collection objectives. <br />In addition to the installation of new wells in the interest areas, existing wells in these <br />areas will be evaluated to supplement the SPDSS monitoring network for spring and <br />~.~.-~ <br />Z:\SPDSS\10-CDM DELIVERABLES\PHASE 2 FIELD WORKPLAN\FINAL DRAFT\FINAL SPDSS TASK 33 2 WORK PLAN.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.