My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33_2_Phase2_FieldStudyWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:15:41 AM
Creation date
6/9/2008 12:58:31 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 Phase 2 Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring
Description
This document presents the Field Study Work Plan for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring. This document includes the memo and figures. Appendices are included in a separate document.
Decision Support - Doc Type
Task Memorandum
Date
8/13/2004
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Platte Decision Support System Groundwater Component Task 33 Field Study Work Plan <br />for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring <br />fall water level monitoring. These wells were installed and/or currently monitored <br />by, USGS, Town of Julesburg, Colorado State University, or other entities. It is <br />anticipated that up to six additional existing wells will be added to the SPDSS <br />monitoring network, at each of the Balzac and Julesburg interest areas, and that up to <br />three existing wells will be added at the Beaver Creek interest area. <br />The target number of wells to be installed and monitored in each of the areas <br />mentioned below is subject to change if mutually agreed upon by the State and CDM, <br />depending on the availability of existing monitoring wells, site access, and the receipt <br />of additional data that would fill existing data gaps and make well installation <br />unnecessary. Specific locations will be identified to the State prior to initiating <br />fieldwork. <br />Table 3 Lower South Platte Alluvium Region Areas of Interest for Phase 2 Alluvial Well Installation <br />and Testin <br /> Number of <br /> Potential Existing <br /> Number of Aquifer <br /> Number of Existing Tests in <br /> Proposed Supplemental Interest <br />Area New Wells Wells Total Area Rationale and Ob'ectives <br />Beaver 2 3 5 2 Estimation of the groundwater <br />Creek flux discharging from Beaver <br /> Creek to alluvium of main <br /> stem of South Platte (Figure <br /> 11) <br />Balzac 2 6 8 2 Evaluate surface water - <br /> groundwater interaction and <br /> groundwater flux in the main <br /> stem alluvium at this stream <br /> gauge location and evaluate <br /> impacts of irrigation diversion <br /> on groundwater system <br /> Fi ure 12 <br />Julesburg 3 12 15 2 Evaluate surface water - <br /> groundwater interaction in the <br /> main stem alluvium at this <br /> stream gauge location and <br /> enhance the understanding of <br /> the aquifer properties and <br /> overall groundwater flux in the <br /> vicinity of the State line <br /> Fi ure 13 <br />Total 7 21 28 6 <br />2.3 Task 36, Proposed Denver Basin Region Bedrock Aquifer <br />Monitoring Well Location <br />The Denver Basin bedrock aquifers have been extensively characterized in the Front <br />Range Urban Corridor, including information on aquifer configuration and <br />characteristics. However, an evaluation of the bedrock data indicates there are <br />significant areas where aquifer data are not available, most notably outside of the <br />Front Range Urban Corridor. Depending on the outcome of bedrock data collection <br />~.~.-~ <br />Z:\SPDSS\10-CDM DELIVERABLES\PHASE 2 FIELD WORKPLAN\FINAL DRAFT\FINAL SPDSS TASK 33 2 WORK PLAN.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.