My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:16:30 AM
Creation date
6/9/2008 11:25:35 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 - Phase 3 Field Study Work Plan for Streambed Conductance Testing and Water Level Measurment
Description
This document presents the Field Study Work Plan design, Task 33.2 of Phase 3 of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Task Memorandum
Date
8/3/2005
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 2 <br />Field Data Collection Objectives <br />In addition, up to four more bedrock wells completed in the Denver Basin bedrock <br />aquifers, as defined by the Denver Basin Rules (DWR 1985), will be selected for water <br />level measurement. These wells will be instrumented and used to record water levels <br />at least through Phase 5 of the SPDSS. Suitable locations will be identified and <br />provided to the State for its approval prior to installing automated water level <br />transducers and data loggers. The wells will be selected in areas near major pumping <br />centers at locations where cooperators have been identified. <br />2.2.2 Alluvial Water Level Monitoring Locations <br />During Phase 2, several cooperating entities, which were identified as monitoring <br />alluvial water levels either monthly or in the spring and fall, began providing their <br />measurements to the SPDSS. In addition to these wells measured by cooperating <br />entities and those installed for the SPDSS, 10 individuals with wells in locations that <br />were formerly part of the CSU water level monitoring program were identified in the <br />Weldona and Balzac interest areas, and their wells were surveyed during Phase 2. <br />Water levels at all wells installed by the SPDSS will be measured in the spring and <br />fall, with wells operated by cooperating entities anticipated to also be measured in the <br />spring and fall. Water levels at the former CSU monitoring wells will be measured by <br />the SPDSS only during the spring of 2006, prior to irrigation season pumping. The <br />locations of wells to be measured by the SPDSS or cooperating entities are provided in <br />Figure 2-3. <br />`~ ~ <br />2-3 <br />FINAL SPDSS T33 WORK PLAN &3-OS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.