My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:16:30 AM
Creation date
6/9/2008 11:25:35 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 - Phase 3 Field Study Work Plan for Streambed Conductance Testing and Water Level Measurment
Description
This document presents the Field Study Work Plan design, Task 33.2 of Phase 3 of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Task Memorandum
Date
8/3/2005
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 1 <br />Introduction <br />(Figure 1-1). The SPDSS area also includes Designated Basins within the extent of the <br />Denver Basin bedrock aquifers. <br />Many specific elements of the field program depend on results of ongoing analysis of <br />existing reports and on the availability of site access. For these reasons, specific <br />locations for streambed conductance testing are not identified, but rather the general <br />locations where additional data are required are provided in the work plan. As <br />specific locations are finalized, they will be provided to the State and included in <br />reports of results. <br />The Phase 3 field program will commence after the State provides written approval of <br />this Task 33.2 Field Study Work Plan. The field program is anticipated to begin during <br />the late summer of 2005. <br />`~ ~ <br />1-2 <br />FINAL SPDSS T33 WORK PLAN &3-OS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.