Laserfiche WebLink
Section 1 <br />Introduction <br />(Figure 1-1). The SPDSS area also includes Designated Basins within the extent of the <br />Denver Basin bedrock aquifers. <br />Many specific elements of the field program depend on results of ongoing analysis of <br />existing reports and on the availability of site access. For these reasons, specific <br />locations for streambed conductance testing are not identified, but rather the general <br />locations where additional data are required are provided in the work plan. As <br />specific locations are finalized, they will be provided to the State and included in <br />reports of results. <br />The Phase 3 field program will commence after the State provides written approval of <br />this Task 33.2 Field Study Work Plan. The field program is anticipated to begin during <br />the late summer of 2005. <br />`~ ~ <br />1-2 <br />FINAL SPDSS T33 WORK PLAN &3-OS.DOC <br />