My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:16:30 AM
Creation date
6/9/2008 11:25:35 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 - Phase 3 Field Study Work Plan for Streambed Conductance Testing and Water Level Measurment
Description
This document presents the Field Study Work Plan design, Task 33.2 of Phase 3 of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Task Memorandum
Date
8/3/2005
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 1 <br />Introduction <br />1.1 Work Plan Organization <br />This work plan is organized into the following sections: <br />^ Section 1 presents an introduction and overview of the SPDSS Phase 3 field <br />program goals. <br />^ Section 2 summarizes and describes the data collection priorities for the proposed <br />field program. <br />^ Section 3 describes new field activities that will be performed under Phase 3. <br />^ Section 4 describes the reports that will be prepared following completion of the <br />field program. <br />^ Section 5 contains a list of references cited in this Field Study Work Plan. <br />1.2 Introduction <br />This document presents the Field Study Work Plan design, Task 33.2 of Phase 3 of the <br />South Platte Decision Support System (SPDSS)., It supersedes the previously <br />submitted Phase 2 Task 33 Field Study Work Plan for Alluvial and Bedrock Well <br />Installation (CDM 2004), since most of the field activities undertaken in Phase 2 have <br />been completed and are no longer applicable in Phase 3. The two objectives of the <br />Phase 3 Field Program are: <br />^ To perform streambed conductance testing at up to 301ocations to quantify the <br />hydraulic properties of streambed materials for the main stem South Platte River <br />and select tributary channels <br />^ To measure water levels in up to 109 bedrock and 38 alluvial aquifer wells in the <br />autumn, and 48 alluvial aquifer wells in the spring <br />These field activities will aid in characterization of surface water and groundwater <br />interactions and to characterize post-growing season groundwater conditions. These <br />tasks are described in the Scope of Work (SOW) submitted to the Colorado Water <br />Conservation Board (CWCB) on January 10, 2005 (CDM 2005) and further detailed in <br />Section 3. <br />For the purposes of the SPDSS field program in Phase 3, the groundwater study area <br />includes the bedrock aquifers of the Denver Basin and its overlying alluvium, and the <br />alluvium of the main stem of the South Platte River and the mouths of its significant <br />tributaries from approximately Chatfield Reservoir to the Nebraska State Line <br />`~ ~ <br />1-1 <br />FINAL SPDSS T33 WORK PLAN &3-OS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.