My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task33-2_Phase3_StreambedConductanceTestingWorkPlan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 9:16:30 AM
Creation date
6/9/2008 11:25:35 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 33.2 - Phase 3 Field Study Work Plan for Streambed Conductance Testing and Water Level Measurment
Description
This document presents the Field Study Work Plan design, Task 33.2 of Phase 3 of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Task Memorandum
Date
8/3/2005
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CDM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contents <br />Section 1 Introduction <br />1.1 Work Plan Organization .........................................................................1-1 <br />1.2 Introduction ..............................................................................................1-1 <br />Section 2 Field Data Collection Objectives <br />2.1 Task 34 Proposed Streambed Conductance Testing Locations ......... 2-1 <br />2.2 Task 39 Proposed Water Level Monitoring Locations ........................2-2 <br />2.2.1 Bedrock Monitoring Well Locations ......................................2-2 <br />2.2.2 Alluvial Water Level Monitoring Locations ......................... 2-3 <br />Section 3 Field Data Collection Procedures <br />3.1 Task 34 Field Work for Streambed Conductance Data Collection.... 3-1 <br />3.1.1 Initial Site Coring and Evaluation .......................................... 3-2 <br />3.1.2 Channel Cross-Section Profiling ............................................. 3-2 <br />3.1.3 Grain Size Analysis ................................................................... 3-2 <br />3.1.4 Streambed Vertical Hydraulic Gradient Testing .................. 3-3 <br />3.1.5 Streambed Hydraulic Conductivity Testing ......................... 3-3 <br />3.2 Task 39 Collection of Water Level Data ................................................ 3-4 <br />3.2.1 Bedrock Water Level Measurements ..................................... 3-4 <br />3.2.2 Alluvial Water Level Measurements ...................................... 3-5 <br />3.3 Task 39 Surveying .................................................................................... 3-6 <br />Section 4 Documentation of Field Activities <br />Section 5 References <br />Appendices <br />Appendix A Procedure for Field Documentation and Quality <br />Assurance/Quality Control <br />Appendix B Procedure for Water Level Measurement <br />Figures <br />1-1 SPDSS Study Area <br />2-1 Proposed Streambed Conductance Testing Transect Locations <br />2-2 Proposed Bedrock Aquifer Water Level Monitoring Locations <br />2-3 Proposed Alluvial Aquifer Water Level Monitoring Locations <br />`~ ~ <br /> <br />FINAL SPDSS T33 WORK PLAN &3-OS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.