Laserfiche WebLink
MEMO -TASK 91 <br />Table 5. Percentage of Ditch Companies Met for Final Review <br />District Percent of Ditch Companies met in Initial <br />Meetin s Percent of Ditch Companies Met in Follow-Up <br />Meetin s <br />District 1 100% 83% <br />District 2 99% 50% <br />District 3 99% 66% <br />District 4 100% 60% <br />District 5 97% 40% <br />Dlstrlet 6 100% 100% <br />District 7 100% 25% <br />District 8 100% 25% <br />District 9 100% 20% <br />District 23 Met with WC Only Met with WC Only <br />District 47 Met with WC Only Met with WC Only <br />District 48 Met with WC Only Met with WC Only <br />District 64 100% 50% <br />District 80 Met with WC Only Met with WC Only <br />Total <br />The final review meeting with the ditch companies was beneficial for several reasons, including: ensuring <br />that the edits performed were correct; questioning areas that were still unclear after the first meeting; <br />clarifying issues between neighboring ditch companies; and allowing ditch companies to approve the <br />maps and the acreage in their service area. The maps were very accurate at this stage and few edits were <br />made. Most ditch companies were very pleased with the product. Any corrections or notes made on the <br />maps during the final review period were edited in the digital data and checked by the personnel that <br />attended the meeting. Notes from the final review meetings and any edits performed are recorded in the <br />`Ditch Company Contact Database'. Table 6 provides a summary of all the contacts or activities <br />performed by RTi with the ditch companies in Division 1. <br />Table 6. Summary of Contacts and Activities with Ditch Companies <br />RTi Activity With Ditch Company Activity <br />Count First Date <br />Of Activity Last Date <br />Of Activity <br />Contact Letter 250 Jan-04 April-OS <br />Telephone Contact 442 29-Jan-04 1-Dec-OS <br />Irrigation Meeting 278 04-Feb-04 07-Dec-OS <br />Final Review Letter 120 20-Sep-04 Feb-06 <br />Final Irrigation Meeting 50 19-Aug-04 09-Feb-06 <br />Follow-up edits 242 10-Feb-04 March-06 <br />After completing final review and edits from the water user meetings, an internal review of the data was <br />performed. The final assignment of wells to parcels was completed, as described in Section 2.3.2. All <br />parcels were reviewed to ensure that there was a water source and crop type assigned to them. The <br />topology of the parcels was evaluated and overlaps were corrected. Finally, the parcels were formatted <br />into a shapefile consistent with the CDSS and HydroBase format. A description of the CDSS parcel <br />format is presented in Appendix E. <br />Page 12 of 55 ~R~yersfde FecAno[o`(!~Y lnc. <br />4'JaYer Resourer..s Errgi~ecr:np an~i L'ansuFlrnd <br />