My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Broomfield_WCPlan_Applic
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Broomfield_WCPlan_Applic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2012 2:19:35 PM
Creation date
4/30/2008 3:17:00 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-55
Applicant
City and County of Broomfield
Project Name
City and County of Broomfield Water Conservation Plan
Title
City and County of Broomfield Water Conservation Plan Application
Date
10/17/2007
County
Broomfield
Document Relationships
Broomfield 2012 WCPlan
(Message)
Path:
\Water Conservation\DayForward
Broomfield_WCPlan _50%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
Broomfield_WCPlan_95%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
Broomfield_WCPlan_ApprvlLtr
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Broomfield_WCPlan_Email
(Message)
Path:
\Water Efficiency Grants\Day Forward
Broomfield_WCPlan_Invoices
(Message)
Path:
\Water Efficiency Grants\Day Forward
Broomfield_WCPlan_PO
(Attachment)
Path:
\Water Efficiency Grants\Day Forward
Broomfield_WCPlan_RevisedSchedMarch2011
(Message)
Path:
\Water Efficiency Grants\Day Forward
Broomfield_WCPlan_SchedRevision
(Message)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />measure/program identified in Tasl( 5. For the selected measures and <br />programs, identify and briefly document implementation strategies and <br />estimate reductions in average-day and maximum-day demand. <br /> <br />7. Integrate Resources and Modify Forecasts <br /> <br />Use selected measures and programs to consider long-term implications on <br />demand, supply, and revenue. <br /> <br />. Using Worl(sheet 7-1 as a guide, update the demand forecasts from Tasl(s 2 <br />and 3 to include estimated conservation savings associated with selected <br />measures and programs. <br />. Using Worl(sheet 7-2 as a guide, estimate project-specific savings from Tasl( 3 <br />in terms of eliminating the need for, downsizing, or postponing a project over <br />the selected planning horizon; eliminating, reducing, or postponing water <br />purchases, etc. <br />. Using Worl(sheet 7-3 as a guide, update the supply-capacity forecast from <br />Tasl( 4 and associated savings. <br />. Consider effects of selected measures and programs on revenue in the short <br />term and long term (e.g. potential reduction in sales versus reduced variable <br />costs, reduced fixed costs associated with new capital facilities over the <br />selected planning horizon, etc.). <br /> <br />8. Develop Implementation Plan <br /> <br />Identify ways to involve the public and allow the Water Conservation Plan to <br />evolve so that conservation savings are sustainable. <br /> <br />. Using W orl(sheet 8-1 as a guide, develop and document a strategy and <br />timetable for implementing the Water Conservation Water Conservation Plan. <br />Identify goals for specific actions and projected dates to implement measures <br />and programs selected in Tasl( 6. <br />. Identify factors or contingencies that may affect or prevent implementation of <br />specific measures or programs. <br />. Determine the public participation process to inform the public of the Water <br />Conservation Plan and involve the public in implementing, monitoring, and <br />evaluating the Water Conservation Plan over time. <br />. Determine steps and schedule (not greater than 7 years) to implement, <br />monitor, review, and revise the Water Conservation Plan over time to sustain <br />conservation savings. <br /> <br />9. Prepare the Conservation Plan Document <br /> <br />. Prepare a Draft Plan, documenting the information prepared in Tasl(s 1 <br />through 8, which correspond to the CWCB Conservation Planning Steps 1 <br />through 8. <br /> <br />Page A-3 of A-5 <br /> <br />Broolnfield_Conservation Plan App_lO-17-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.