My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12877
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSPC12877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 1:47:05 PM
Creation date
4/15/2008 2:41:06 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.928
Description
Sheephorn Project
State
CO
Date
10/1/1980
Author
W.W. Wheeler and Assoc., inc
Title
Report on Sheep Horn Reservoir Yeild and Cost Estimates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Hyd ro Faci lit i es <br />As it would not be realistic to construct Sheephorn Dam without <br />hydro power facilities, the cost or the hydro plant and related works <br />was made independent of the dam costs. The power facilities estimated <br />costs are as follows: <br /> <br />TAB LE 5 <br />SHEEPHORN POWERHOUSE CONSTRUCTION COSTS <br />(Costs expressed in thousands of dollars) <br /> <br />Powerhouse (23 MW) <br />Transmission Facilities <br />Reregulation Dam <br /> <br />. <br /> <br />Tota I <br /> <br />~18,500 <br />3,300 <br />2.500 <br /> <br />$24,300 <br /> <br />$ 2,700 <br />5,300 <br /> <br />32,300 <br /> <br />$30,000 <br /> <br />Subtotal <br /> <br />Indirect Construction Costs <br />Conti ngenci es <br /> <br />Round to <br /> <br />From the foregoing, the total estimated 1980 cost of the project, <br />including power facilities is $170,000,000. <br /> <br />~ <br /> <br />-16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.