My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12877
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSPC12877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 1:47:05 PM
Creation date
4/15/2008 2:41:06 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.928
Description
Sheephorn Project
State
CO
Date
10/1/1980
Author
W.W. Wheeler and Assoc., inc
Title
Report on Sheep Horn Reservoir Yeild and Cost Estimates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />COST ESTIMATES <br /> <br />. <br /> <br />Sheeohorn Dam and Reservoir <br />Sheephorn Dam would impound 210,000 acre-feet with a dam height <br />of 310 feet. Conceptual engineering sketches were prepared by Stone <br />and Webster Engineering Corporation to enable the quantities of rock <br />excavation, form work concrete and inspection and inspection galleries <br />to be calculated for a concrete gravity dam. The sketches also showed <br />locations for the spillway, the low level outlet and the variable <br />level gated structure on the upstream face. <br />A dam at the proposed site would necessitate relocation of about <br />13 miles of the Denver and Rio Grande Western Railroad. The estimated <br />1980 cost of Sheephorn Dam and relocation of the 13 miles of railroad <br />follows: <br /> <br />TABLE 4 <br />SHEEPHORN DAM CONSTRUCTION COSTS <br />(Costs expressed in thousands of dollars) <br /> <br />Railroad Relocation <br />Four Tunnels - 7,800 feet <br />Track Relocation (13 miles) <br /> <br />$ 22,700 <br />21,700 <br /> <br />Sheephorn Dam (2l0,000 Acre-Feet) <br />Variable Level Intake Structure <br />Dam and Equipment <br /> <br />Subtotal <br /> <br />3,300 <br />53,600 <br /> <br />$101,300 <br /> <br />Total <br /> <br />$ 11,100 <br />22,300 <br /> <br />$134,700 <br /> <br />$140,000 <br /> <br />Indirect Construction Costs <br />Contingencies <br /> <br />Round to <br /> <br />a <br /> <br />-15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.