My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12877
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSPC12877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 1:47:05 PM
Creation date
4/15/2008 2:41:06 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.928
Description
Sheephorn Project
State
CO
Date
10/1/1980
Author
W.W. Wheeler and Assoc., inc
Title
Report on Sheep Horn Reservoir Yeild and Cost Estimates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />Green Mountain and Ruedi Reservoir Operation <br />Green Mountain Reservoir was operated in general co.~pliance with <br />Senate Document 80. The 52,000 acre-root pool was used exclusively <br />for replace~ent of Colorado-Big Thompson out Or priority diversions. <br />Because of the unknown future use of the 100,000 acre-feet of Green <br />Mountain capacity, it was filled in each year from surplus Shoshone <br />flows and was assumed to be released in September. This release was <br />treated as ir it \oJere a transmountain diversion,- i.e., a 100 percent <br />depletion. <br />In the operation study, Ruedi Reservoir was filled to the extent <br />possible each year. An average of 58,400 acre-feet was released in <br />the same rashion and accounted for in the same manner as releases rrom <br /> <br />Green Mountain Reservoir. <br /> <br />Cameo Requirements <br />In Senate Document 80 it is stated that lithe ruture demands (Cameo) <br />are then estimated as 1,800 second-feet in the months of May to August, <br />inclusive, tapering off uniformly to 800 second-feet on April and <br />Nove'TIber 30." In the \"Iater studies it IfJas assumed that these require- <br />ments would be met each month and each year. The future Cameo require- <br />ments, set forth in Senate Document 80, are compared to the actual use <br />in 1977, a very critical runorr year, in the rollowing table. <br /> <br />t10nth <br /> <br />January <br />Feb rua ry <br />Ma rch <br />Apri 1 <br />Hay <br />June <br />July <br />August <br />September <br />Oc tobe r <br />November <br />Decenber <br /> <br />TAB LE <br />Values in 1,000 Acre-Feet <br />Requirements-Senate Document 80 Recorded 1977 Diversions <br /> <br />TOTAL <br /> <br />49.2 <br />44.4 <br />49.2 <br />77 .4 <br />110.7 <br />107.1 <br />110.7 <br />110.7 <br />97.2 <br />79.9 <br />57.5 <br />49.2 <br /> <br />943.2 <br /> <br />49.1 <br />44.4 <br />54.2 <br />71.0 <br />92.2 <br />92.5 <br />100.8 <br />82.4 <br />84.7 <br />65.0 <br />22.5 <br />49.1 <br /> <br />807.9 <br /> <br />-9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.