My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOODC00179
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOODC00179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:23:36 AM
Creation date
4/14/2008 3:57:54 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Wiggins
Stream Name
Kiowa Creek
Basin
South Platte
Title
Operations and Maintenance Manual - Kiowa Creek Flood Protection Project
Date
1/1/1989
Prepared For
Wiggins, Department of Local Affairs
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />5.3 Closures <br /> <br />Burlinaton Northern Railroad Stop Loa Closure - The stop <br />log closure at this location should be maintained to insure <br />that the key-way grooves for the stop logs remain open. The <br />stop logs shall be inspected annually to insure that no <br />cracking, warping or deterioration of the logs is <br />occurring. If any problems are noted, measures shall be <br />undertaken immediately to repair or replace the damaged <br />items. The concrete floodwalls associated with the <br />structure shall be inspected for spalling, cracks, and <br />settlement. <br /> <br />U.S. Hiahwav 6 Stop Loa Closure - The stop log closure at <br />this location should be inspected annually to determine no <br />damage has occurred to the key-way grooves for the stop <br />logs. The manhole for the "H Beam" center support shall be <br />opened and inspected to insure that debris has not filled <br />the cavity. The stop logs shall be inspected to determine <br />that no cracking, warping or deterioration is occurring. <br />The concrete floodwalls associated with the structure shall <br />be inspected for spalling, cracks, and settlement. If any <br />problems are noted, measures shall be undertaken to replace <br />or repair the damaged items. <br /> <br />5.4 Interior Drainaae System <br /> <br />The Town's interior drainage system which is gravity flow <br />shall be inspected annually and necessary cleaning shall be <br />accomplished to insure there are no obstructions to the free <br />flow of drainage water. The following additional inspection <br />and maintenance is required: <br /> <br />a. Pipes, culverts. and any headwalls are in good <br />condition. <br /> <br />-19- <br />
The URL can be used to link to this page
Your browser does not support the video tag.