<br />Note: GeoTechnical information and site investigations are necessary for choosing the <br />optimal site for the intake structure and designing the structure. Site conditions may affect <br />the field work schedule. <br /> <br />Task 1 e. Develop Design for Intake Structure and Water Treatment Plant with adequate <br />detail for Permitting Process <br /> <br />Personnel and Fees: <br /> <br />. Design-Build Team <br />. Consultant (see Task 4) <br />. Board (In-kind) <br />. Other Invested Parties (In-kind) <br /> <br />Completion Date: <br /> <br />. May 7,2008 <br /> <br />Note: The Water Treatment Plant will not be built during this phase of the project. However, <br />it is necessary to determine the size and location of the plant so that it can be permitted <br />under with the Intake Structure (see Task 2c and 2d). <br /> <br />Task 1f. Develop Detailed Design of Intake Structure <br /> <br />Personnel and Fees: <br /> <br />. Design-Build Team $ .55 - .65 million <br />. Consultant (see Task 4) <br />. Board (In-kind) <br />. Other Invested Parties (In-kind) <br /> <br />Completion Date: <br /> <br />. July 31,2008 <br /> <br />A detailed cost estimate for each sub-task will be available mid-March. <br />Task 2. Project Permitting - NEPA - Land Lease License Agreement <br />Task 2a. Submit Application for Temporary Access Permit (for GeoTechnical work) <br />Personnel and Fees: <br />. Design-Build Team (see Task 1) <br />. Consultant <br />. Board (In-kind) <br />Completion Date: <br />. March 14, 2008 <br />Task 2b. BaR determine Categorical Exclusion and Issue Temporary Access Permit <br />Personnel and Fees: <br />. BaR (Fees Waiver Pending) <br />. Consultant <br />. Board (In-kind) <br /> <br />LPWW A - Scope of Work, Timeline, Budget, Deliverables, Personnel <br />WSRA Statewide Grant Application <br /> <br />2/27/2008 <br />Page 12 <br />