Laserfiche WebLink
<br />LA PLATA WEST RURAL DOMESTIC WATER SUPPLY SYSTEM <br /> <br />SCOPE OF WORK <br /> <br />Task 1. Intake Structure and Associated Infrastructure Design <br /> <br />Task 1 a. Issue Request for Proposal for Preliminary Designs from Design-Build Teams <br /> <br />Personnel and Fees: <br /> <br />. Consultant (see Task 4) <br />. Attorney (see Task 4) <br />. Board (In-kind) <br /> <br />Completion Date: <br /> <br />. January 31, 2008 <br /> <br />Task 1 b. Select and Retain a Design-Build Team <br /> <br />Personnel and Fees: <br /> <br />. Consultant (see Task 4) <br />. Attorney (see Task 4) <br />. Board (In-kind) <br />. Design-Build Team <br /> <br />Completion Date: <br /> <br />. March 7, 2008 <br /> <br />Note: The Preliminary Design Proposals included costs, land procurement, permitting <br />issues, building constraints and the ability to work with the ALP schedule. Based on the <br />proposals reviewed by LPWWA, a design-build team will be selected to work on the project <br />(see Appendix C). <br /> <br />Task 1 c. Conduct field work for GeoTechnical and Site Information <br /> <br />Personnel and Fees: <br /> <br />. GeoTechnical Subcontractor (cost under Design-Build Team) <br />. Design-Build Team <br />. Consultant (see Task 4) <br />. Board (In-kind) <br /> <br />Completion Date: <br /> <br />. April 4, 2008 <br /> <br />Task 1 d Complete Laboratory Work and GeoTechnical Report <br /> <br />Personnel and Fees: <br /> <br />. GeoTechnical Laboratory (cost under Design-Build Team) <br />. Design-Build Team <br /> <br />Completion Date: <br /> <br />. May 2, 2008 <br /> <br />LPWW A - Scope of Work, Timeline, Budget, Deliverables, Personnel <br />WSRA Statewide Grant Application <br /> <br />2/27/2008 <br />Page 11 <br />