My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - La Plata West Rural Domestic Water Supply_Statewide Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Southwest - La Plata West Rural Domestic Water Supply_Statewide Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 11:33:19 AM
Creation date
3/13/2008 3:44:05 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Southwest
Applicant
La Plata West Water Authority
Description
La Plata West Rural Domestic Water Supply System
Account Source
Basin & Statewide
Board Meeting Date
3/19/2008
Contract/PO #
150422
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LA PLATA WEST RURAL DOMESTIC WATER SUPPLY SYSTEM <br /> <br />SCOPE OF WORK <br /> <br />Task 1. Intake Structure and Associated Infrastructure Design <br /> <br />Task 1 a. Issue Request for Proposal for Preliminary Designs from Design-Build Teams <br /> <br />Personnel and Fees: <br /> <br />. Consultant (see Task 4) <br />. Attorney (see Task 4) <br />. Board (In-kind) <br /> <br />Completion Date: <br /> <br />. January 31, 2008 <br /> <br />Task 1 b. Select and Retain a Design-Build Team <br /> <br />Personnel and Fees: <br /> <br />. Consultant (see Task 4) <br />. Attorney (see Task 4) <br />. Board (In-kind) <br />. Design-Build Team <br /> <br />Completion Date: <br /> <br />. March 7, 2008 <br /> <br />Note: The Preliminary Design Proposals included costs, land procurement, permitting <br />issues, building constraints and the ability to work with the ALP schedule. Based on the <br />proposals reviewed by LPWWA, a design-build team will be selected to work on the project <br />(see Appendix C). <br /> <br />Task 1 c. Conduct field work for GeoTechnical and Site Information <br /> <br />Personnel and Fees: <br /> <br />. GeoTechnical Subcontractor (cost under Design-Build Team) <br />. Design-Build Team <br />. Consultant (see Task 4) <br />. Board (In-kind) <br /> <br />Completion Date: <br /> <br />. April 4, 2008 <br /> <br />Task 1 d Complete Laboratory Work and GeoTechnical Report <br /> <br />Personnel and Fees: <br /> <br />. GeoTechnical Laboratory (cost under Design-Build Team) <br />. Design-Build Team <br /> <br />Completion Date: <br /> <br />. May 2, 2008 <br /> <br />LPWW A - Scope of Work, Timeline, Budget, Deliverables, Personnel <br />WSRA Statewide Grant Application <br /> <br />2/27/2008 <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.