My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Las Animas Sanitary Sewer System Improvements_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Las Animas Sanitary Sewer System Improvements_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2009 12:03:08 PM
Creation date
3/13/2008 3:19:35 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Arkansas
Applicant
City of Las Animas
Description
City of Las Animas Sanitary Sewer System Improvements
Account Source
Statewide
Board Meeting Date
3/19/2008
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br />Fonn Revised May 2007 <br /> <br />In addition to the fees mentioned above, the city also has standard fees for wastewater service calls. Given a typical year, <br />the city generates 90% or more of its wastewater revenues from user fees. The remaining portion is a combination of the <br />interest income, tap fees and the "other" fees. The last source of revenue available to the sanitary sewer system is a portion <br />of the sales tax generated within the city. Las Animas assesses a 3% sales tax. Revenue from the sales tax is funneled <br />into the general fund along with some specific funds contained within the city's overall governmental funds. One of the <br />funds is specifically designated to receive a portion (1/3 of the 3% assessment) of the sales tax revenues, which is called <br />the Infrastructure and Improvement Fund. This fund has been established to provide capital construction funds for the <br />installation of infrastructure improvements. The sewer enterprise fund as well as other city funds have access to the <br />Infrastructure and Improvement Fund for capital construction needs when authorized by the city council. The funds <br />contained within the Infrastructure and Improvement Fund area generated from sales tax receipts and are restricted to the <br />construction and improvement of the city's infrastructure. <br /> <br />4. If the Contracting Entity is different then the Applicant (Project Sponsor or Owner) please describe the Contracting Entity <br />here. <br /> <br />Same as noted above. <br /> <br />Part B. - Description of the Water Activity - Please Refer to Criteria and Guidance Document for Eligibly <br />Requirements <br /> <br />1. What is the purpose of this grant application? <br /> <br />Environmental compliance and feasibility study <br /> <br />Technical Assistance regarding permitting, feasibility studies, and environmental compliance <br /> <br /> <br />Studies or analysis of structural, nonstructural, consumptive, nonconsumptive water needs, <br />projects <br /> <br />Study or Analysis of: <br /> <br /> <br />Structural project or activity <br /> <br />Nonstructural project or activity <br /> <br />Consumptive project or activity <br /> <br />I Nonconsumptive project or activity <br /> <br />x <br /> <br />Structural and/ or nonstructural water project or activity <br /> <br />F:\WPDATA\Las Animas\Wastwater\06 SSCoI\Financial\Roundtable\06-07 Application (may 07).doc <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.