My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Grand County Stream Flow Mgmt Plan Phase III_Water Activity Summary
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Grand County Stream Flow Mgmt Plan Phase III_Water Activity Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 2:31:15 PM
Creation date
3/13/2008 2:32:09 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
Grand County
Description
Grand County Stream Flow Management Plan - Phase III
Account Source
Basin
Board Meeting Date
5/21/2008
Contract/PO #
150461
WSRA - Doc Type
Water Activity Summary Sheet - CWCB Evaluation/Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />?Identify goals and techniques to achieve the desired restoration outcome and develop concept <br />details for design. This task includes consideration of improvements for the purpose of habitat <br />improvements, diversion improvements, and reconstruction for increasing depth of flows under low <br />flow conditions. <br /> <br /> <br />?Prepare plan view, profile, and typical section engineering drawings as appropriate that illustrate <br />the general location, extent, and configuration of design components. <br /> <br /> <br />?Using the hydraulic analyses prepared in task 3.4.2 determine the final channel cross section, slope <br />and conveyance. Determine flooding potential for the 100-year event for the proposed-project <br />conditions. The purpose of this analysis is to evaluate the impacts of the proposed restoration and <br />to insure the restoration does not cause flooding of existing structures and roads under proposed- <br />project conditions that might not be occurring under existing conditions. <br /> <br /> <br />?Identify staging areas, temporary work areas, disposal area, construction roads etc. <br /> <br /> <br />?Identify utilities impacted by the designs. <br /> <br /> <br />?Address the potential permitting requirements. <br /> <br /> <br />?Develop quantity estimates for the selected plan. <br /> <br /> <br />?Document the design methods and criteria used. <br /> <br /> <br />?Prepare a narrative describing the project area design components. Discuss the types and quantities <br />of design materials, including vegetation. <br /> <br /> <br />?Prepare conceptual construction cost estimates <br /> <br /> <br />?Coordinate with the County to identify required easements. <br /> <br />3.5 <br />Report Documentation and Recommendations. This task will include recommendations for final <br />design and implementation of proposed restoration components. This task for will also include a <br />preliminary cost analysis for services and a conceptual cost analysis for construction. <br /> <br />3.6 <br />Meetings and Coordination: Throughout this effort we anticipate the following: <br /> <br /> <br />?Two meetings with Grand County and/or the management committee. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.