My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00307
CWCB
>
Weather Modification
>
DayForward
>
WMOD00307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:35:06 PM
Creation date
3/11/2008 11:22:03 AM
Metadata
Fields
Template:
Weather Modification
Title
A Proposal for Cooperative Weather Research Between the Santa Barbara County Water Agency and the US Department of Interior Bureau of Reclaimation in the Context of the Weather Damage Modification Program through the State of CA 2002-2003 Winter Season
Date
10/17/2002
State
CA
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Weather Damage Modification Program 20 <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />he designed a full undergraduate meteorological curriculum, and taught many of the courses <br />himself. He was the chair of the Atmospheric Sciences Department, which emphasized two <br />tracks: Forecasting (operational meteorology) and Climatology. <br /> <br />Technician <br /> <br />The electronics and rawinsonde technician for the WMI project facilities will be either Mike <br />Johnson or Todd Schulz. Both have been technicians for Weather Modification, Inc., for several <br />years, and are very experienced with all the WMI facilities to be deployed. <br /> <br />1.54 Personnel Summary <br /> <br />The personnel assembled for this project have near 300 years of experience in meteorology, <br />atmospheric research and modeling, weather modification, trace chemistry, hydrology, project <br />administration and environmental compliance. We feel we have put together a strong team, that <br />given the resources can produce an exceptional and useful research program. <br /> <br />Complete resumes for all key project personnel are provided in Appendix C <br /> <br />1.6 Environmental Compliance <br /> <br />SBCW A, WMI and NA WC will comply with all environmental regulations pertaining to this <br />proposed project. <br /> <br />~\,J <br />~ <br /> <br />California Environmental Quality Act (CEQA): The operational program had environmental <br />review in 1981 when the program was initiated by the County of Santa Barbara. In 1995 when <br />the Twitchell (Alamo-Huasna) watershed was added to the program the environmental review <br />was updated to reflect this change. The review was once again updated in 2001 to consolidate <br />paperwork between the two different watersheds seeded. This analysis concluded that the <br />ongoing cloudseeding program has no significant adverse impacts. A negative declaration (ND) <br />is filed each year for the operational program. For the research project, the County will file a <br />categorical exemption. The exemption will be 15306: Basic data collection, research, <br />experimental management, and resource evaluation activities. <br /> <br />National Environmental Protection Act (NEPA): Catagorical exemption 516DM2, appendix 1, <br />item 1.6: Non-destructive data collection, inventory (including field, aerial and satellite <br />surveying and mapping) study, research and monitoring activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.