Laserfiche WebLink
<br />Table V-4 <br />Construction Cost Estimate <br />South Side Dam Spillway (Alternative 2) <br /> <br />Item No Item Description Quantit\ Unit Unit Price Total Cost <br />1 Mobilization/demobilization 1 L.S. 3,00C 3,000 <br />2 Demolition 1 L.S. 2,OOC 2,000 <br />3 Erosion Control 1 L.S. 2,70C 2,700 <br />4 Earth Excavation 100 C.Y. 4.0C 400 <br />5 Compacted Backfill 100 C.Y. 5.00 500 <br />6 Furnish and Place Structural 25 C.Y. 500.00 12,500 <br /> Concrete <br />7 Furnish and Place Specialized 25 C.Y. 10.00 250 <br /> Backfill <br />8 Furnish and Place Riprap 200 C.Y. 60.0C 12,000 <br /> 33,350 <br /> Subtotal Construction Cost 33,350 <br /> 20% Contingency 6,670 <br /> Total Estimated Cost (rounded) $40,000 <br /> <br />25 <br />