<br />Chapter VI - Selection of Alternative and Financial Plan <br /> <br />A. Narrative Description <br /> <br />Table VI-1 presents a summary of the alternatives developed for the outlet works <br />and lists major advantages and disadvantages. Based on construction cost and the <br />desires of the SSRC the preferred Outlet Works Alternative is relining. Because of <br />the unknowns associated with the existing outlet and the need to refine the relining <br />alternative in design, financing for the removal and replacement alternative is being <br />requested. The construction cost of the outlet works removal and replacement is <br />approximately $289,500. <br />The spillway issues would involve some survey and engineering to determine actual <br />field conditions and routing the 100-year inflow flood through the defined spillway. <br />Based on accomplishing the field survey and engineering analysis, the Spillway <br />Alternative 2 would be the desired alternative. The construction cost of rehabilitation <br />of the spillway is $40,000 <br /> <br />Description Approx. Advantages Disadvantages <br /> Cost <br />Outlet Works <br />Alternative 1 (No NA None Loss of Valuable <br />Action) Asset <br />Alternative 2 $289,500 . Reliable design . Higher cost <br />(Replacement) . High flow capacity <br />Alternative 3 $157,900 . Reliable design . Flow <br />(Relining) . Lower cost Capacity <br /> slightly less <br />Spillway Issues <br />Alternative 1 (No NA None Loss of Valuable <br />Action) Asset <br />Alternative 2 $40,000 . Reliable design . Must <br />(Design for 100- . Meet dam safety maintain <br />Year Flood) requirement over life of <br /> asset <br /> <br />Table VI-1 <br />Comparison of alternatives <br /> <br />26 <br />