Laserfiche WebLink
<br />Table V-3 <br />Construction Cost Estimate <br />South Side Dam Outlet Works (Reline CIPP - Alternative 3) <br /> <br />Item No Item Description Quantit~ Unit Unit Price Total Cost <br />1 Mobil ization/demobilization 1 L.S. 14,OOC 14,000 <br />2 Demolition 1 L.S. 20,OOC 20,000 <br />3 Dewatering 1 L.S. 20,OOC 20,000 <br />4 Erosion Control 1 L.S. 1,00C 1,000 <br />5 Earth Excavation 200 C.Y. 4.0C 800 <br />6 Compacted Backfill 100 C.Y. 5.0C 500 <br />7 Furnish and Place Pipe Bedding 30 C.Y. 25.0C 750 <br />8 Furnish and Place Structural 50 C.Y. 500.0C 25,000 <br /> Concrete <br />9 Furnish and Place Mass Concrete 5 C.Y. 200.0C 1,000 <br /> Pipe Encasement <br />10 Furnish and Place Specialized 50 C.Y. 10.0C 500 <br /> Backfill <br />11 Furnish and Place Riprap 100 C.Y. 60.0C 6,000 <br />12 Furnish and Place 16" CIPP Liner 150 L.F. 200.0C 30,000 <br />13 Furnish and Install 16" Sluice Gate 1 Ea. 12,000.OC 12,000 <br /> and operator. <br /> 131,550 <br /> Subtotal Construction Cost 131,550 <br /> 20% Contingency 26,310 <br /> Total Estimated Cost (rounded) $157,900 <br /> <br />24 <br />