Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SELECTED ALTERNATIVE <br /> <br />OILC has selected the second alternative as the most cost effective. <br /> <br />PROJECT COST <br /> <br />Following is a summary of all project costs including engineering fees and contingencies. <br /> <br />TOTAL <br /> <br />Estimated Cost <br />$ 293,996 <br />$ 44,099 <br />$ 50,000 <br />$ 388,095 <br /> <br />Item <br />1. <br />2. <br />3. <br /> <br />Construction Costs <br />15% Contingency <br />Engineering Fees <br /> <br />OILC is seeking funding through the Colorado Water Conservation Board "Small Projects <br />Fund" to finance $350,000 of the project. OILC will fund the remaining amount through an <br />increase in assessments and/or a short term loan through a private institution. <br /> <br />A construction cost estimate provided by GLH construction is provided on tablH 2. <br /> <br />FUND REQUIREMENT SCHEDULE <br /> <br />OILC is applying for a '$350,000 loan (90% of the estimated cost) at an interest rate of <br />2.50% for an agricultural loan with a 20 year term. A copy of the loan application is <br />included in Appendix E. The yearly repayment for the loan will be approximately <br />$22,451.50 per year for a total loan cost of $449,030. Yearly funds required by OILC for <br />the first 10 years would be $24,696.65 to account for the reserve fund (Certificate of <br />Deposit) required by the CWCB which is equal to one yearly payment placed in reserve <br />over a 10 year period of time. The reserve can be used to pay the final payment in the <br />year 2023 and does not change the overall total cost of the project. <br /> <br />The total project cost is estimated at approximately $388,095 and it is expected that OILC <br />will be providing all funds in excess of the $350,000 loan request. The funds required by <br />both the CWCB and OILC over the life of the project are shown in Table 1. <br /> <br /> <br />TABLE 1 <br />FUND REQUIREMENT SCHEDULE <br /> <br />2003 <br />2004-2013 <br /> <br />2014-2023 <br /> <br />$ 38,095 <br />$ 24,696.65 <br /> <br />$ 22,451.50 <br /> <br />$ 350,000 <br /> <br />Rehabilitation of Seeley Lake Outlet - Feasibility Study <br /> <br />Page 7 <br />