<br />Chapter VI - Cost Estimate
<br />
<br />Item No. Item Description Quantity Unit Unit Price Total Cost
<br />24 FilterlDrain Material 53,000 Cubic Yard $20,00 $1,060,000
<br />25 Toe Drain Gravel Material 150 Cubic Yard $25.00 $3,750
<br />26 6-Inch Perforated PVc Toe Drain Pipe 2,500 Linear Feet $15.00 $37,500
<br />27 6-Inch Nonperforated PVC Toe Drain Pipe 130 Linear Feet $12.00 $1,560
<br />28 2-Inch Nonperforated PVC Drain Pipe 470 Linear Feet $8.00 $3,760
<br />29 Manholes and Sump Pumps For Toe Drains 3 Each $5,000 $15,000
<br />30 Type 1 Riprap 31,650 Cubic Yard $30.00 $949,500
<br />31 Bedding for Type I Riprap 11,850 Cubic Yard $25.00 $296,250
<br />32 Filter Fabric 47,500 Sq. Yd. $1.00 $47,500
<br />33 Seeding and Reclamation of Downstream
<br /> Embankment Face 14,5 Acres $5,000 $72,500
<br />34 Piezometer Installations 825 Linear Feet $30.00 $24,750
<br />35 Station Marker Installations 49 Each $150.00 $7,350
<br />36 Survey Point Installations 7 Each $300.00 $2,100
<br /> OUTLET WORKS CONSTRUCTION
<br />37 Type I or 2 Backfill 20 Cubic Yard $10.00 $200
<br />38 Roller Compacted Concrete Backfill 630 Cubic Yard $110.00 $69,300
<br />39 Type 1 Riprap at Outlet Structure 80 Cubic Yard $30.00 $2,400
<br />40 Bedding for Type I Riprap at Outlet Structure 30 Cubic Yard $25.00 $750
<br />41 Type 3 Riprap at Inlet Structure 150 Cubic Yard $8.00 $1,200
<br />42 Structural Concrete for Outlet Pipe Encasement 212 Cubic Yard $450.00 $95,400
<br />43 Structural Concrete for Inlet, Baffled Outlet,
<br /> Valve Vault and Retaining Wall Structures 326 Cubic Yards $500.00 $163,000
<br />44 36-Inch Sluice Gate, Complete 1 Lump Sum $40,000 $40,000
<br />45 36-Inch Diameter Epoxy Lined Steel Outlet
<br /> Pipe and Bend 1 Lump Sum $115,000 $115,000
<br />46 lO-Inch Diameter DIP Bypass Piping in Valve
<br /> Vault Structure 1 Lump Sum $2,500 $2,500
<br />47 Miscellaneous Metalwork 1 Lump Sum $60,000 $60,000
<br />48 30-Inch Fixed Cone Valve 1 Lump Sum $95,000 $95,000
<br />49 lO-Inch Bypass Fixed Cone Valve 1 Lump Sum $40,000 $40,000
<br />50 Chain Link Fence 57 Linear Feet $20.00 $1,140
<br /> RCC SPILL WAY CONSTRUCTION
<br />51 Roller Compacted Concrete 11,900 Cubic Yard $110.00 $1,309,000
<br />52 Structural Concrete 550 Cubic Yard $550.00 $302,500
<br />53 Type 2 Grouted Riprap in Spillway Channel 400 Square Yard $110.00 $44,000
<br />54 Handrails 70 Linear Feet $25,00 $1,750
<br /> PUMP STATION BUILDING
<br />55 Pump Station Site Demolition I Lump Sum $50,000 $50,000
<br />56 Constructing Pump Station Building 1 Lump Sum $400,000 $400,000
<br />57 Vertical Turbine Pumps 3 Each $105,000 $315,000
<br />58 Sleeve Valves 1 Each $70,000 $70,000
<br />59 Surge Tank System I Lump Sum $70,000 $70,000
<br />