<br />Chapter VI . Cost Estimate
<br />
<br />Chapter VI - Cost Estimate
<br />
<br />Project costs are considerably higher that those estimated in the original study, The original
<br />study presents a total project cost of $10,470,597 while the total estimated costs are currently
<br />$21,600,000 as shown in Table VI-2. The cost increase is primarily due to the construction of a
<br />larger reservoir including the additional property acquisition required for the project. Table VI-I
<br />provides a detailed breakdown of the probable construction costs.
<br />
<br />Table VI-I: Probable Construction Costs
<br />
<br />Item No. Item Description Quantity Unit Unit Price Total Cost
<br /> GENERAL
<br />1 Mobilization/Demobilization @ 7% 1 Lump Sum $942,796 $942,796
<br />2 Sediment and Erosion Control 1 Lump Sum $60,000 $60,000
<br />3 Diversion and Control of Water During
<br /> Construction 1 Lump Sum $150,000 $150,000
<br />4 Seeding and Reclamation of Disturbed Areas 23 Acres $3,500 $80,500
<br />5 Site Grading for Unimproved Access Road 9,450 Linear Feet $2.00 $18,900
<br />6 Aggregate Base Course Surfacing 6,425 Cubic Yard $25.00 $160,625
<br />7 Barbed Wire Fence and Tubular Gates 20,300 Linear Feet $3.00 $60,900
<br /> DAM CONSTRUCTION, GENERAL ..
<br />8 Clearing, Grubbing, and Stripping 100 Acres $1,500 $150,000
<br />9 Grading Along Downstream Toe of Dam and
<br /> Spillway and Outlet Channels 1 Lump Sum $70,000 $70,000
<br />10 Backfilling Borrow Area 2 1,000 Cubic Yard $3.75 $3,750
<br /> DAM CONSTRUCTION
<br />11 Upstream Shell Foundation Excavation 112,000 Cubic Yard $2.00 $224,000
<br />12 Downstream Shell Foundation Excavation 48,000 Cubic Yard $2.00 $96,000
<br />13 Key Trench Excavation 110,000 Cubic Yard $3.00 $330,000
<br />14 Upstream and Downstream Shell Foundation
<br /> Preparation 77 ,500 Sq, Yd. $1. 00 $77 ,500
<br />15 Key Trench Foundation Preparation 20,000 Sq. Yd. $12.00 $240,000
<br />16 Outlet Works Foundation Preparation 1,400 Sq. Yd. $12.00 $16,800
<br />17 Spillway Foundation Preparation 2,000 Sq. Yd. $12.00 $24,000
<br />18 Slush Grouting 350 Cubic Yard $200.00 $70,000
<br />19 Dental Concrete 170 Cubic Yard $250.00 $42,500
<br />20 Zone 1 Borrow Excavation 870,000 Cubic Yard $2.50 $2,175,000
<br />21 Dewatering Borrow Area 1 1 Lump Sum $100,000 $100,000
<br />22 Zone 1 Key Trench Embankment Fill 110,000 Cubic Yard $2.25 $247,500
<br />23 Zone 1 and Zone lA Dam Embankment Fill 680,000 Cubic Yard $2.00 $1,360,000
<br />
<br />Dry Creek Reservoir Project
<br />
<br />19