Laserfiche WebLink
<br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />- <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I- <br />~ . <br />. <br />,. <br />I. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Chapter VI - Cost Estimate <br /> <br /> - <br />Item No. Item Description Quantity Unit Unit Price Total Cost <br />60 Pump Station Piping I Lump Sum $100,000 $100,000 <br />61 General Valves 1 Lump Sum $285,000 $285,000 <br />62 Miscellaneous Mechanical 1 Lump Sum $45,000 $45,000 <br />63 Sewage System Improvements I Lump Sum $5,000 $5,000 <br />64 Pump Station Start-up and Testing I Lump Sum $25,000 $25,000 <br /> PIPELINES <br />65 24-Inch Diameter Class 300 DIP 2,900 Linear Feet $104,00 $301,600 <br />66 24-Inch Diameter Class 250 DIP 3,624 Linear Feet $102.00 $369,648 <br />67 24-Inch Diameter Class 200 DIP 1,055 Linear Feet $100.00 $105,500 <br />68 24-Inch Diameter Steel Pipe 369 Linear Feet $215.00 $79,335 <br />69 AirN ac Vaults 2 Each $10,000 $20,000 <br />70 Meter Vault I Lump Sum $77 ,000 $77,000 <br />71 Overexcavation to Remove Unsuitable Material <br /> in Pipe Trench Foundation 60 Cubic Yards $50.00 $3,000 <br />72 Additional Rock Refill for Pipe Trench <br /> Foundation Stabilization: <br /> a. Depth of 0- to 12-Inches 10 Cubic Yards $30.00 $300 <br /> b. Depth of 12- to 24-Inches 20 Cubic Yards $40,00 $800 <br /> c. Depth over 24-Inches 30 Cubic Yards $70,00 $2,100 <br />73 Blow-Off I Each $4,000 $4,000 <br />74 Imported Pipeline Backfill Material 420 Cubic Yard $30.00 $12,600 <br /> ELECTRICAL SYSTEMS <br />75 Electrical Systems 1 Lump Sum $400,000 $400,000 <br /> INSTRUMENT A TION AND CONTROL SYSTEMS <br />76 Instrumentation and Control Systems 1 Lump Sum $130,000 $130,000 <br /> TOTAL ESTIMATED CONSTRUCTION COST $14,440,000 <br /> <br />Table VI-2: Probable Project Costs <br /> <br />Description Estimated Cost <br />Construction Management Services $430,000 <br />Land Acquisition $6,670,000 <br />Legal Fees $60,000 <br />Construction (details provided in Table VI-I) $14,440,000 <br />Total Project Costs $21,600,000 <br /> <br />Dry Creek Reservoir Project <br /> <br />21 <br /> <br />BOYLE <br />