My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150155 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150155 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:44:15 AM
Creation date
2/26/2008 9:58:55 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150155
Contractor Name
Rio Grande and Piedra Valley Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />Water Right: 94.48 CFS <br /> <br />Average water diverted per year: 17,600 acre-feet <br /> <br />6" Will the acquisition of additional water rights be necessary? YES <br /> <br />NO <br /> <br />x <br /> <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attomey(s). <br /> <br />ADDRESS and PHONE <br />NRCS; 0881 N. Highway 285; Monte Vista, Colorado 81144 <br /> <br />NAME <br /> <br />Laurie A. Clark, PE <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. NRCS will complete a feasibility study and send under separate cover. <br />Designs are completed and structures will be set in place during construction. On site <br />quality control will also be provided by the NRCS. <br /> <br />9. Estimated cost of the project. Please include estimated engmeenng costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: $ 0.00 <br /> <br />Estimated Construction Costs: $ 52,000.00 <br /> <br />Estimated Total Costs: $ 52,000.00 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 52,000.00 <br />Term (length) ofloan: 30 years <br />Interest Rate: 2.5% <br /> <br />(Usually 75% of Estimated Total Costs) <br /> <br />(Usually 10,20, or 30 years) <br /> <br />(Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fimd, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity" It is <br />also requested that the project sponsor submit with this application copies of the two most recent <br />annual reports, financial statements, corporate reports or other current documentation of <br />financial condition and operations. <br /> <br />3 <br /> <br />CFLA902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.