My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150155 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150155 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:44:15 AM
Creation date
2/26/2008 9:58:55 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150155
Contractor Name
Rio Grande and Piedra Valley Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For example, bank <br />loans, government agency loans, bond issues, accounts payable, etc. Include names and <br />addresses of lenders, amounts, due dates and maturity dates. Attach a separate schedule, if <br />needed. <br /> <br />Lender Name & Address <br /> <br />Remaining <br />Amount <br /> <br />Annual <br />Payment <br /> <br />Maturity <br />Date <br /> <br />N/A <br /> <br />2. Are any of the above liabilities now in default, or been in default at any time in the past? <br />YES_ NO _' If YES, please give detailed explanation. N/A <br /> <br />3. Please provide a summary of all revenues received during the last two fiscal years by category <br />(such as service charges, tap fees, assessments, etc.). See attached financial statement for <br />the year 2002. <br /> <br />4. Please provide a brief narrative description of sources of funding, in addition to the CWCB, <br />which have been explored for this project (Examples would be Banks, Rural Development, <br />NRCS, Colorado Water Resources and Power Development Authority, Colorado Division of <br />Local Government, etc.). NRCS will provide aU en~ineerin~ at no cost to the Ditch <br />Company. This is to include a feasibility study, desi~ns of the new stmctures, settin~ <br />structures in place at the time of construction and construction inspection. <br /> <br />5. What collateral will you be offering for this loan? Possibilities include the project itself, pledge <br />of revenues, real estate, water rights. We could ~ive you a pled~e of ditch assessment <br />revenues and the project we are buildin~. <br /> <br />4 <br /> <br />CFLA902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.