Laserfiche WebLink
<br /> <br />SECTION 5 - SCHEDULE OF EXISTING DEBT <br />The Town of Kremmling, Colorado, water enterprise has an outstanding loan from the <br />State of Colorado Department of Local Affairs (the "DOLA Loan") and has outstanding <br />its Water Revenue Refunding Bonds, Series 2004 (the "'Series2004 Bonds'''). The <br />DOLA Loan has a current balance of $21,474, and will be payable in full in 2005. The <br />Series 2004 Bonds are currently outstanding in the principal amount of $480,0100, and <br />mature in 2025. The DOLA Loan and the Series 2004 Bonds have a lien on the . <br />revenues pledged to the payment of this loan that is on parity with the lien of this loan, <br />and the Parity Certificate is incorporated herein by reference. <br />SECTION 6 - ADDITIONAL CONDITioNS & CONTRACT REQUIREMENTS <br />There are no additional conditions for this loan. :4-._. <br />SECTION 7 - CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWeB staff for verification of compliance <br />with the terms of this Contract when available prior to bidding. Any modifications <br />to the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br />by S 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid op~ning and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be seh~cted by <br />the BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the. contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed,. sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to procel~d to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre-construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BORROWER shall construct the PROJECT in accordance with the approved <br />plans and specifications. <br /> <br />Page 2 of 3 <br />