My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01923 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01923 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 8:26:51 AM
Creation date
2/21/2008 4:17:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150126
Contractor Name
Kremmling, Town of
Contract Type
Loan
Water District
50
County
Grand
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, or, if required by 9 37-87-105, C.R.S., <br />the BORROWER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrangE~ a final <br />inspection for the CWCB staff. <br />L. The BORROWER shall pay. all of the expenses related to the PROJECT whEm such <br />bills are due. <br />M. PROJECT-related expenses incurred prior to the Effective Date of this contract in <br />accordance with the legislative approval of this loan., <br />SECTION 8 _ ELIGIBLE EXPENSES. The following items are eligible for loan <br />disbursements. <br />A. Preparing final designs and specifications for the PROJECT. <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management, including design and <br />construction management for CWCB-approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br />Contract. <br />I. Legal services for reviewing engineering services contracts, reviewing this <br />Contract, reviewing construction contract documents, and for complying with all <br />federal, state, and local regulatory requirements. <br />SECTION 9 - DISBURSEMENT SCHEDULE <br />For Project costs: The BORROWER shall prepare a periodic progress report which <br />contains a statement of the PROJECT costs expended for that period and ShSl1l forward <br />said statement to the CWCB. . After receipt of the periodic progress report: from the <br />BORROWER, and review and acceptance of the items therein as eligible expenses as <br />described below, the CWCB will pay to the BORROWER the amount set forth in the <br />report or such portion that has been approved by the CWCB. Such payment shall be <br />made within thirty (30) days from the CWeB's approval of each progress report. <br />SECTION 10 - TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is <br />signed by the State Controller or his designee). <br />PROJECrFinish: Two (2) years from the Effective Date of this Contract <br /> <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.