My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01923 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01923 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2013 8:26:51 AM
Creation date
2/21/2008 4:17:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150126
Contractor Name
Kremmling, Town of
Contract Type
Loan
Water District
50
County
Grand
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />PROJECT SUMMARY - KREMMLlNG - CONTRACT No. C1501;26 <br /> <br />SECTION 1 -BORROWER INFORMATION <br />Name: Town of Kremmling acting by and through its water enterprise <br />Address: P. O. Box 538, Kremmling, CO 80459-0538 <br />Contact: Sharon Cesar, Town Clerk <br />FederallD Number: 84-6000683 <br />Phone Number: 970-724-3249 Fax Number: 970-724-9409 <br />E-mail address: manaaer@townofkremmlina.ora <br />Type of Entity: The Town of Kremmling, Colorado was incorporated in 1890. The <br />BORROWER, the Town of Kremmling, Colorado's water ent1erprise, <br />is a water activity enterprise established by the BORROWER by <br />Resolution 2003-6-1, adopted June 18, 2003, and reaffirmed by <br />Ordinance 482 adopted July 21, 2004, pursuant to Article 45.1, <br />Title 37, C.RS., which are incorporated herein by reference. The <br />Enterprise was formed and is operated as an enterprise within the <br />meaning of COLO. CONST. Art. X, Section 20. <br />SECTION 2 - PROJECT DESCRIPTION <br />Description of PROJECT: The BORROWER applied for a CWeB loan (in the original <br />amount of $1,000,000, and increased in May 2004 to $1,689,750) for construction of <br />an alternative water supply system to supplement its existing system, hereinafter <br />referred to as the PROJECT. The estimated total cost of the PROJECT is $2,447,750 <br />and includes construction of two pump stations. and a pipeline. <br />Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PROJECT entitles "Feasibility of Constructing a Raw Water Delivery System for <br />the Town of Kremmling", dated October 2002, compiled with the assistance of Dave <br />Jones of Applegate Group and Cort Nickel of RTW engineering, which is incorporated <br />herein by reference, and, based upon the fea~ibility report, the CWCB determined the <br />PROJECT to be technically and financially feasible. <br />SECTION 3 - CWCB's AUTHORITY <br />Small Proiect Loan: This loan is made pursuant to the provisions of SS 37'-60-11.9 <br />and 37-60-120, C.RS., which authorizes the CWCB to loan money for water projects <br />for the benefit of the people of the State, provided that the borrower assures <br />repayment of that money. <br />Section 37-60-122(1)(b) C.RS., authorizes the CWCB to make loans of up to <br />$5,000,000 from the eWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. . <br />SECTION 4 . BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br />At its November 2002, meeting, the CWCS approved a loan to the BORROWER in an <br />amount up to $1,000,000 at an interest rate of 4.25% per annum for a repayment term <br />of 30 years, and at its May 2004, meeting, the CWCB approved a loan increase in the <br />amount of $689,750 for a total loan amount of $1,689,750 at an interest rate of 4.25% <br />per annum for a repayment term of 30 years. <br /> <br />Appendix 1 to Loan Contract C150126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.