My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01921 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01921 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:25 AM
Creation date
2/21/2008 4:16:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153311
Contractor Name
Nunn, Town of
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 78-69
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />t <br />I <br />I <br />, 11 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4. Installation of an electrical system to automate pump <br /> <br />operation and to control the water level in the storage <br /> <br />tanks. <br /> <br />The Project <br /> <br />The town board opted to update the total System and adopted <br /> <br /> <br />all of the recommendations made in the feasibility study. The <br /> <br /> <br />Engineer was authorized to proceed with design plans for the <br /> <br /> <br />project. <br /> <br />Several months were spent trying to find an adequate source <br /> <br /> <br />of water in Lone Tree basin. 'Eight-test wells were drilled and <br /> <br /> <br />the yield was forecast on each well. One site indicated that an <br />infiltration gallery (figs. III, IV) would supply adequate water <br />for the towns' present and '~uture needs. The town Board compared <br /> <br /> <br />the estimated cost of the infiltration gallery against two other <br /> <br /> <br />alternatives and decided that the infiltration gallery was the <br /> <br /> <br />most feasible from a cost standpoint. <br /> <br />The infiltration gallery was installed in early 1981. A <br /> <br /> <br />complete testing (quantity and quality) was completed in May 1981 <br /> <br /> <br />and plans were completed for the storage and transmission system <br /> <br /> <br />necessary to connect to the existing town system (fig. V-VIII). <br /> <br /> <br />The plans, specifications and bidding documents were subsequently <br /> <br /> <br />approved and bids were opened on November 10, 1981. <br /> <br />- 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.