My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01921 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01921 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:25 AM
Creation date
2/21/2008 4:16:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153311
Contractor Name
Nunn, Town of
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 78-69
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />J <br />I <br />I <br />I <br />I <br /> <br />The bids were within the engineers estimate, and the town <br /> <br /> <br />decided that they would purchase a 100,000 gallon bolted steel <br /> <br /> <br />storage tank, with permaglas coating, 9500 feet of PVC <br /> <br />transmission line, pump station, and 7,000 of new PVC water main <br /> <br />in the city distribution system. The system also included <br /> <br /> <br />telemetering lines and control equipment to combine the new <br /> <br /> <br />system to the old storage tank and pumps. <br /> <br />Project Financing <br /> <br />Co~orado Water Conservation Board <br />Farmers Home Administration (Grant) <br /> <br />Total'Cost <br /> <br />$209,000 <br />$190,000 <br />$399,000 <br /> <br />To repay the CWCB construction advance over a 40 year period <br /> <br />the town raised water rates to approximately $14.00jmo. <br /> <br />- 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.