Laserfiche WebLink
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I" <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br />preliminary design of the recommended improvements as well as a <br /> <br />detailed cost estimate for those improvements was included in the <br /> <br /> <br />study. <br /> <br />The specific recommendations included in the study for Nunn <br />were as follows: <br /> <br />1. Construct two or more shallow aquifer wells as needed in the <br /> <br />Lone Tree Creek Basin, north and east of Nunn. <br /> <br />2. Construct the following pipe system improvements: <br /> <br />a. 9100+ feet (depends on the location of wells determined <br /> <br /> <br />in final design) of 6" transmission line from the new <br /> <br /> <br />wells to tie into existing distribution system in <br /> <br /> <br />the town. <br /> <br />b. An additional 7510 feet of 6" distribution pipeline <br />within the town. <br /> <br />c. Miscellaneous valves, hydrants, crosses, etc. associated <br /> <br />with pipelines. <br /> <br />3. Construct an additional 50,000 gallon elevated storage tank <br />with necessary piping, valves, etc. <br /> <br />- 3 - <br />