My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150113 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150113 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:33 AM
Creation date
2/21/2008 3:17:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150113
Contractor Name
Lake Arrowhead Water Association
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Alternative 2 - No-Action <br /> <br />If the improvements to the dam are not completed, the SEO could restrict the storage; and <br />could effectively require the complete breach ofthe dam and loss of the storage reservoir. The costs <br />associated with this alternative would be for the lost of the water rights. The lost of the water rights <br />would cost approximately $1,900,000, based on the annual reservoir yield for 474 AF at a rate of <br />$4,000/AF. Boyle believes this is not a viable alternative and it is precluded from further <br />consideration. <br /> <br />Lake Arrowhead Dam Rehabilitation Feasibility Study <br /> <br />13 <br /> <br />B~DVLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.