Laserfiche WebLink
<br />Table V-2 <br />Construction Cost <br />i\lt t' 1 Fl I t <br /> <br /> erna Ive ep acemen <br /> Item Description Quantity Unit Unit Price Total Cost <br />Mobilization/Demolition 1 Lump Sum $40,000.00 $40,000 <br />Site Demolition 1 Lump Sum 10,000.00 10,000 <br />Clearing and Grubbing 2 Acre 2,000.00 4,000 <br />Control of Water 1 Lump Sum 10,000.00 10,000 <br />Replacing Embankment Fill 5,000 Cubic Yard 10.00 50,000 <br />Compacted Backfill 50 Cubic Yard 5.00 250 <br />Fumishing and Placing Filter/Sand Material 130 Cubic Yard 25.00 3,250 <br />Fumishing and Placing Drain Gravel Material 380 Cubic Yard 25.00 9,500 <br />Fumishing and Placing Riprap 550 Cubic Yard 45.00 24,750 <br />Fumishing and Placing Bedding for Riprap 280 Cubic Yard 25.00 7,000 <br />Unclassified Excavation 4,800 Cubic Yard 10.00 48,000 <br />Borrowing and Placing Embankment Fill 1,200 Cubic Yard 10.00 12,000 <br />Excavating and Disposing of Existing Riprap 200 Cubic Yard 10.00 2,000 <br />Sediment and Erosion Control 1 Lump Sum 2,000.00 2,000 <br />Fumishing and Installing 6-inch Slotted PVC Drain 890 Linear Feet 5.00 4,450 <br />Pipe <br />Fumishing and Installing 6-inch Solid PVC Drain 70 Linear Feet 5,00 350 <br />Pipe <br />Fumishing and Installing 6-inch SCH 80 steel Pipe 8 Linear Feet 20.00 160 <br />Fumishing and Installing 24-inch Steel Pipe 140 Linear Feet 200.00 28,000 <br />Fumishing and Placing Structural Concrete 22 Cubic Yard 500.00 11,000 <br />Fumishing and Placing Mass Concrete 150 Cubic Yard 150,00 22,500 <br />Fumishing and Placing Precast Concrete Manhole 2 Each 500.00 1,000 <br />Reclamation of Disturbed Areas 2.0 Acre 3,000.00 6,000 <br />Subtotal Construction Costs $296,210 <br /> Construction Monitoring 15,500 $15,500 <br />Subtotal Construction and Engineering $311,710 <br /> Contingencies @ 20% $62,342 <br />Total Estimated Cost (Rounded) $375,000 <br /> <br />Lake Arrowhead Dam Rehabilitation Feasibility Study 12 13CJVLE <br />