My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150113 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150113 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:33 AM
Creation date
2/21/2008 3:17:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150113
Contractor Name
Lake Arrowhead Water Association
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter VI - Selection of Alternative and Financial Plan <br /> <br />A. Narrative Description <br /> <br />Based on the financial, institutional, and social impacts, Alternative 1- Replacement is <br />selected as the preferred alternative for the dam rehabilitation. The preferred alternative was selected <br />based on constructablity, costs, reliability, reduced impact to the environment, and provision for the <br />continued use of the asset (historic water yield). <br /> <br />B. Hydraulic and Structural Design Criteria <br />Hydraulic design criteria are primarily limited to the sizing of the outlet pipe. The outlet pipe <br />will be sized based on the SEO criteria presented in their Dam Safety Project Review Guide. <br />Structural design will follow the present version ofthe ACI code. <br /> <br />C. Land and Right-of-Way Requirements <br /> <br />The Company owns the embankment and inundated land upstream of the dam centerline axis. <br />The construction of the project will be performed on the land that the Company owns. <br /> <br />D. Project Implementation Schedule <br />Table VI-l is a potential schedule for implementing this project. <br /> <br />E. Cost Estimates <br />Table V-2 presents an estimate of the construction and construction engineering costs <br />associated with the selected spillway alternative for this project. The design ofthe project is $29,000 <br />including geotechnical and surveying services, and this feasibility report. The design phase of the <br />project will include the design of the outlet pipe and toe drain system. Table VI-2 summarizes the <br />costs estimated for this project. <br /> <br />F. Financial Program <br />The Company does not have any outstanding loans (long-term debt) with the CWCB. Using <br />estimated project costs of $404,000, the total amount eligible for CWCB financing at 75 percent <br />would be $303,000. Subtracting the grant for the feasibility study loan from this amount indicates <br />that they could apply for a loan of approximately $298,000 as shown in Table VI-3. <br /> <br />Lake Arrowhead Dam Rehabilitation Feasibility Study <br /> <br />14 <br /> <br />B~DVLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.