Laserfiche WebLink
<br />Chapter VI - Selection of Alternative and Financial Plan <br /> <br />A. Narrative Description <br /> <br />Based on the financial, institutional, and social impacts, Alternative 1- Replacement is <br />selected as the preferred alternative for the dam rehabilitation. The preferred alternative was selected <br />based on constructablity, costs, reliability, reduced impact to the environment, and provision for the <br />continued use of the asset (historic water yield). <br /> <br />B. Hydraulic and Structural Design Criteria <br />Hydraulic design criteria are primarily limited to the sizing of the outlet pipe. The outlet pipe <br />will be sized based on the SEO criteria presented in their Dam Safety Project Review Guide. <br />Structural design will follow the present version ofthe ACI code. <br /> <br />C. Land and Right-of-Way Requirements <br /> <br />The Company owns the embankment and inundated land upstream of the dam centerline axis. <br />The construction of the project will be performed on the land that the Company owns. <br /> <br />D. Project Implementation Schedule <br />Table VI-l is a potential schedule for implementing this project. <br /> <br />E. Cost Estimates <br />Table V-2 presents an estimate of the construction and construction engineering costs <br />associated with the selected spillway alternative for this project. The design ofthe project is $29,000 <br />including geotechnical and surveying services, and this feasibility report. The design phase of the <br />project will include the design of the outlet pipe and toe drain system. Table VI-2 summarizes the <br />costs estimated for this project. <br /> <br />F. Financial Program <br />The Company does not have any outstanding loans (long-term debt) with the CWCB. Using <br />estimated project costs of $404,000, the total amount eligible for CWCB financing at 75 percent <br />would be $303,000. Subtracting the grant for the feasibility study loan from this amount indicates <br />that they could apply for a loan of approximately $298,000 as shown in Table VI-3. <br /> <br />Lake Arrowhead Dam Rehabilitation Feasibility Study <br /> <br />14 <br /> <br />B~DVLE <br />