My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01894 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01894 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:00:23 AM
Creation date
2/21/2008 2:40:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150030
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Engineers from W AP A have prepared preliminary cost estimates included in the <br />following table: <br /> <br />Silt Substation Rebuild to 115kV <br />Estimate prepared on January 14,2003 <br /> <br />115/69 - 13.8kV, 1,500kV A transformer <br />13.8 kV - 2.4kV/480 volt 1,500kV A transformer <br />3 115k V line structures <br />Other work <br />Construction Contract Total <br /> <br />$176,000 <br />35,000 <br />50,000 <br />$106.000 <br />$367,000 <br /> <br />Planning <br />Environment/Lands <br />Design <br />Inspection <br />Construction Management <br />Commissioning <br />Labor Subtotal <br /> <br />$ 10,000 <br />5,000 <br />44,000 <br />20,000 <br />20,000 <br />25.000 <br />$124,000 <br /> <br />Project Total <br />Contingency <br />TOTAL ESTIMATED COST <br /> <br />$491,000 <br />10% <br />$540,100 <br /> <br />Implementation Schedule <br /> <br />Sept. 2003 <br />Feb. 2004 <br />Oct. 2003 <br />Feb. 2004 <br />April 2004 <br />Oct. 2004 <br />Dec. 2004 <br />Jan. 2005 <br /> <br />Jan. 2004 <br />July 2004 <br />Feb. 2004 <br />July 2004 <br />Sept. 2004 <br />Feb. 2005 <br />March 2005 <br />April L 2005 <br /> <br />Comments <br />Start when funding available <br />TBA <br />Pending transformer delivery <br /> <br />Item <br />Planning <br />Environmental <br />Design Start <br />Design & Spec Completion <br />CFE Power Transformers <br />Procurement <br />A ward of Contract <br />Construction Start <br />Commissioning <br />In-service <br /> <br />Earliest Date <br /> <br />Latest Date <br /> <br />Assume 1 year lead time <br />Assume 3 mo. for solicitation <br />Assume 4 mo. lead on material <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.