<br />Table 1 Project Schedule <br />Action Item Anticipated Completion <br /> Disclosed in the <br /> Application for Water Status and Revised <br /> Efficiency Grant Anticipated Completion <br />Order Phase I materials and initiate Middle of July 2007 Completed end of September <br />installation* 2007 <br />Complete installation of Phase I Mid/End of October 2007 Completed end of October <br />materials* 2007 <br />Complete set up/training and begin Mid/End of October 2007 Anticipate completion end of <br />operations of Phase I May 2008 <br />Submit 50 percent completion reports End of October 2007 Submitted to CWCB end of <br />to CWCB December 2007 <br />Complete installation of Phase II End of October 2007 Anticipate completion end of <br />materials June 2008 <br />Submit 95 percent completion report Beginning of November Anticipate submission to CWCB <br />to CWCB 2007 by end of July 2008 <br />Complete set up and begin operation Beginning of 2008 Anticipate completion end of <br />of Phase II new equipment irrigation season July 2008 <br />Submit final completion report to 2008 irrigation season Anticipate completion end of <br />CWCB 2009 irrigation season <br />Collect monitoring data and estimate End of 2008 irrigation Anticipate completion end of <br />2008 & 2009 irrigation water savings season 2009 irrigation season <br /> <br />* All billed materials and work conducted prior to the CWCB grant purchase order will be paid by the District as a <br />portion of their match. <br /> <br />The District plans to complete the set up and begin operations of the Phase II equipment <br />in July 2008. Originally it was anticipated that this would be completed at the beginning <br />of the 2008 irrigation season where a complete set of irrigation data would be available to <br />estimate water savings and develop the final completion report. The District plans to <br />defer the final completion report until the end of the 2009 irrigation season when a full <br />set of irrigation data would be available for analysis. <br /> <br />Goals and Objectives <br />The District has met their goals and objectives for the Phase I installation. The <br />equipment was successfully installed. As previously indicated, weather and budgetary <br />constraints have impacted the remainder of the project schedule. The District has revised <br />the project schedule as indicated in Table 1. <br /> <br />Preliminary Findings and Obstacles <br />The installation of the irrigation management system equipment was achieved as <br />planned and no major obstacles were encountered. However, the District encountered <br />several challenges with the operational set up of the central control station, <br />communications system, and the weather station. <br /> <br />· Central control station: The District experienced difficulty in programming the <br />central control station computer. Remote assistance from the CALSENSE <br />contractor did not prove to be sufficient and a CALSENSE technician had to be <br />brought in to address the programming issues onsite. <br />