Laserfiche WebLink
<br />- <br /> <br />estimate if number is greater than 500 plants; note the phonological stage of the plants; <br />note the specific geomorphologic, hydrologic, and soil conditions; provide photographs. <br /> <br />Task 3 _ Prepare Survey Report. A detailed report will be prepared documenting <br />results of the field surveys, methodology used, including appropriate maps, photos and <br />data sheets. <br /> <br />Task 4 _ Meetings and Coordination. This task will include meetings and contacts <br />between the contractor, Corps representatives, Chatfield State Park and Division of <br />Wildlife staffs and <br />the USFWS as necessary. <br /> <br />Task 5 _ Project Management and Quality Assurance/Quality Control. Task <br />includes all oversite and directions by the Project Manager over staff performing the <br />surveys and the compilation of the report. <br /> <br />Task 6 _ Organize and Maintain Project Work Files. Task includes developing and <br />maintaining file system to contain all materials, text, photos, and maps, etc. collected for <br />the plant survey report. The file will become the property of the Corps at the completion <br />of the project. <br /> <br />Cost Estimate <br />Task 2004 2005 <br />1. Prepare/Conduct Recon $4,600 $4,600 <br />Survey <br />2. Conduct Detailed Survey $18,000 $18,000 <br />3. Prepare Survey Report $16,500 $16,500 <br />4. Meetings and Coordination $1,000 $1,000 <br />5. Proiect ManagementlQAlQC $4,000 $4,000 <br />6. Organize/Maintain File $900 $900 <br />Total $45,000 $45,000 <br /> <br /> <br />2 <br />