Laserfiche WebLink
<br />- <br /> <br /> <br />· Hydrology <br />· Reservoir Operations & Water Control <br />· Environmental <br />· Economics <br />· Dam Safety <br /> <br />B. Scientific Information <br /> <br />Based upon the self-evaluation by the PDT, it is unlikely that the Corps report to <br />be disseminated will contain influential scientifi~ information. <br /> <br />C. Timing <br /> <br />The Peer Review process is envisioned to begin during mid-year 2007. It is <br />anticipated that work would start within days of naming the ITR team. The estimated <br />schedule is noted in Part 8 of this Appendix. <br /> <br />D. EPR Process <br /> <br />No External Peer Review process is envisioned at this time. <br /> <br />E. Public Comment <br /> <br />Public involvement is anticipated throughout the duration of the study. <br /> <br />F. Dissemination of Public Comment <br /> <br />It is anticipated that minutes of the Public Involvement Meetings will be <br />disseminated to the Peer Review Team following the meetings. This will allow the <br />public response to be available to the ITR team. <br /> <br />G. Reviewers <br /> <br />David A. Brandon (402-221-4889) is the Technical Coordinator for the overall <br />effort. The appropriate Section Chiefs or technical experts will be the Technical <br />Coordinators for their respective functions and have certified this Quality Control <br />Plan below. <br /> <br />NAME <br /> <br />TECHNICAL COORDINATOR CERTIFICATION <br />FUNCTIONAL <br />DISCIPLINE <br /> <br />PHONE <br /> <br />SIGNATURE <br /> <br /> <br />David A. Brandon <br /> <br />Plan Formulation <br /> <br />402,221-4889 <br /> <br />8 <br />