My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00152
CWCB
>
Publications
>
DayForward
>
PUB00152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 11:19:47 AM
Creation date
1/18/2008 12:46:45 PM
Metadata
Fields
Template:
Publications
Year
2007
Title
Chatfield, Cherry Creek, and Bear Creek Colorado Reallocation Feasibility Study
CWCB Section
Administration
Author
US Army Coprs of Engineers
Description
Chatfield, Cherry Creek, and Bear Creek Colorado Reallocation Feasibility Study
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />unacceptable risks are identified, that alternatire will be dropped from further <br />consideration. : <br /> <br />10. PEER REVIEW PLAN <br /> <br />The components of the Peer Review Plan Were developed pursuant to the <br />requirements of EC 11 05-2-408. <br /> <br />A. Basic Information <br /> <br />The decision documents that will be the ultimaJe focus of the peer review process <br />are the Feasibility Report, the Division Commander's Public Notice and the Final EIS <br />Record of Decision (ROD) for this General Investigation Feasibility Study. The <br />purpose of the decision document will be to begin the approval process leading to the <br />preparation ofa revised Water Control Manual. <br /> <br />The District PDT is listed as follows. This list provides the names and points of <br />contact of team members that are available to answer specific technical questions as <br />part of the Peer Review Process: <br /> <br />1) District Product Delivery Team <br /> <br />The study team is comprised of qualified staff from within and outside the Omaha <br />District. Team members are identified below. <br /> <br />NAME ORG FUNCTIONAL PHONE E-MAIL <br /> DISCIPLINE <br />Eric Laux NWO- CE Project 402-221-7186 eric.a.laux(aJ,usace.annv.mil <br /> PM-AE Manager <br /> (PM) <br />Tom CWCB CWCB Project 303-866-4804 Tom.browning@state.co.us <br />Browning Manager <br />Gary Drendel Tetra Tech Tetra Tech Project 303-980-3546 ~drendel(aJ,ttfwi.com <br /> Manger <br />Joe Busto CWCB CWCB Assistant 303-866-4807 joe. busto(aJ,state.co. us <br /> PM <br />Gene Weglinski Tetra Tech Tetra Tech, Staff 303-980-3505 l!:ene. wel!:linski(aJ,tetratech- ffx.com <br />Joel NWO-ED- Hydrologic 402-221-4580 joel.d.knofczynski(aJ,usace.anny.mil <br />Knofczynski HE Engineer <br />Gary Lien NWO-ED- Hydraulic Engineer 402-221-4585 ~arv .s.lien(aJ,usace.annv .mil <br /> HD <br />Jay Lincoln NWO-ED- Hydraulic Engineer 402-221-3257 jav .g.lincoln(aJ,usace.annv .mil <br /> HA <br />Elizabeth Peake NWO- Community 402-221-4474 elizabeth. b. peakelq),usace.annv .mil <br /> PM-AE PlannerlNEP A <br />Eric Laux NWO- Biologist 402-221-7186 Eric.a.laux(aJ,usace.annv.mil <br /> <br />6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.