My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:37 PM
Creation date
1/18/2008 10:18:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2008
Description
OWCDP Section - Town of Castle Rock - Synthetic Turf Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Castle Rock Synthetic Turf Project <br />Application for Water Efficiency Grant <br />Table 5: Preliminary Project Schedule <br />Task Sub-Task Anticipated Completion <br />Complete Synthetic Turf N/A End of November 2007 <br />Design <br />Bid Process and Contractor Complete Bidding Process Middle of January 2008 <br />(s) Selection <br />Construction Contractor Mobilization Beginning of February 2008 <br /> Completion of Grading and End of April 2008 <br /> Utilities <br />50% Completion Report is n/a End of May 2008 <br />submitted to CWCB <br />Construction Completion of the synthetic End of June 2008 <br /> turf field installation <br />95% Completion Report is n/a End of June 2008 <br />submitted to CWCB <br />Construction Project Closeout Beginning of August 2008 <br />Public Education Information on Project August 2008 <br /> Distributed to the Public <br />Final Completion Report is n/a August 2008 <br />submitted to CWCB <br />6.0 Budget Cost Estimate <br />The budget cost estimate is provided in Table 6. Details of the construction <br />contractor(s) costs are provided in Table 7. This estimate provides information on <br />Castle Rock and DCSD's in-kind contributions (i.e, staff time and capital <br />expenditures) and anticipated allocation of costs based on the requested level of grant <br />funding from CWCB. The total CWCB grant funding request is $86,013, representing <br />a 22% state share in the cost of the project. The requested level of grant funding is <br />necessary to implement the project, based on Castle Rock's estimated costs and <br />DCSD's funding constraints. While DCSD would cover the cost of installing a natural <br />turf field, financial constraints prevent DCSD from encumbering the additional funds <br />necessary for the synthetic turf surface. Castle Rock acknowledges the need to <br />implement this water-saving measure as part of implementation of its approved <br />Conservation Plan, but Castle Rock's annual budget does not cover the full <br />incremental cost of installing synthetic turf. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.