Laserfiche WebLink
Gastle Rock Synthetic Tun Project <br />Application (or Water Efficiency Grant <br />Table 6 Estimate of Costs <br /> consn'uction DCSD Staff Hours and <br /> Design Consultants contractor(s) Costs Castle Rack Staff Hours and Costs Funding Sources <br /> Design Parks Castle Castle <br /> Concepts Project Water Maintena DCSD DCSD Rock Rock <br /> and JVA Civil Manager Conser- lJtilities Park Commu- a Total Staff Match Match Match Match <br /> Landscape Engin- Labor and Project Lobar vation Program Super- oily Super- Staff Lahar CWCB (Cash (In-kind (Cash (In-kind <br />Task Description Architects Materialst Manager Hours Costs Specialist Analyst intendant Relations intendant Hours Costs Grant Funds) Services) Funds) Services) Total <br /> Rate/hour n/a n/a n/a $3G.D0 n/a $33.55 $40.26 $33.65 $32.45 $42.G7 n/a n/a n/a n/a n/a n/a n/a n/a <br />1.0 Desi n $7,881 $15,386 $0 60 $2,150 20 20 20 0 0 60 $2,151 $0 $11,633 $2,160 $11,533 $2,151 $27,578 <br /> Contractor <br />20 Selection and $0 $0 $0 40 $1,440 20 20 450 0 60 550 $19,131 $0 $0 $1440 $0 $19,131 $20,fi21 <br /> Project <br />Mona ement <br />30 GonstYUCtlon $0 $0 $344,050 0 $0 0 0 0 0 0 0 $0 $86.013 $129,019 $0 $129,019 $0 $344,050 <br />4.0 Public <br />Education $0 $0 $0 0 $0 50 50 10 80 0 190 $6.628 <br />' $0 $0 $0 $0 $6,628 $6,628 <br />Total $7,887 $'15,386 $344,050 d0U $3,694 90 90 480 SD 6D SDO $27,960 $86,073 $144,652 $3,600 $148652 $27,96D $398,876 <br />Dost Sltare Calculation: <br />Total Project Costs-$398.876 <br />Gastle Rock contribution (cash plus in-kind) - $168,612 <br />DCSD contribution (cash plus In-kind) -$144,252 <br />Total Gastle Rack con[rlbution as a percent of total cost - 42 <br />Total DCSD contribution as percent of total cost - 36 <br />Total GWGB Gran[ contribution - $86,013 <br />Table 7 Details of Construction Contractor(s) Casts <br />Bid <br />Item Description Detail Unit Quantity Unit cast Total Cost <br /> Synthetic Field 2x5 treated boards to form the edge of <br />1 Nailer the feld to contain gravel fll material LF 955 $3 $2,855 <br /> One 4" layer of 3/4" washed gravel <br /> Synthetic Field under 2" of compacted foe gravel base <br />2 Base Material (substructure of feld) SF 55,570 $1 $55,670 <br /> Synthetic Field <br /> Subsunace French drain system designed to mov <br />3 Drainage water from under the feld suHace LS 1 $35,000 $35000 <br />4 Synthetic tun Synthetic Turf with crushed rubber infll SF 55,570 $5 $250,515 <br />Total $344,050 <br />